2297 Southern Loop Road & Paving: Lots H & P Pavement Improvements
Federal opportunity from WAKE TECHNICAL COMMUNITY COLLEGE - CONSTRUCTION. Place of performance: NC. Response deadline: Mar 26, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 28 more rate previews.↓
Point of Contact
Agency & Office
Description
Pavement replacement and maintenance for Lots H & P. Project will primarily include replacement of pavement for Lot H. Lot P may include pavement replacement, mill and overlay, or other methods of asphalt maintenance. Construction associated with the pavement replacement or maintenance may have impacts on sidewalks, curb & gutter, stripping, and drainage. Lots located at the Southern Wake Campus (SWC)
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.