Skip to content
Wake Technical Community College - Construction

2297 Southern Loop Road & Paving: Lots H & P Pavement Improvements

Solicitation: Not available
Notice ID: ncevp_e3e9b7c54e84facdc480068d59290f0b85c7eafb
DepartmentWake Technical Community College - ConstructionStateNCPostedMar 05, 2026, 12:00 AM UTCDueMar 26, 2026, 02:00 PM UTCCloses in 21 days

Federal opportunity from WAKE TECHNICAL COMMUNITY COLLEGE - CONSTRUCTION. Place of performance: NC. Response deadline: Mar 26, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$2,005,945,060
Sector total $2,005,945,060 • Share 100.0%
Live
Median
$165,737
P10–P90
$28,800$2,500,000
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($2,005,945,060)
Deal sizing
$165,737 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Place of Performance
Not listed — check the files for details.

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
NC20260104 (Rev 0)
Match signal: state matchOpen WD
Published Jan 02, 2026North Carolina • Lincoln
Rate
BRICKLAYER
Base $18.62Fringe $0.00
Rate
CARPENTER
Base $17.51Fringe $0.47
+28 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 28 more rate previews.
Davis-BaconBest fitstate match
NC20260104 (Rev 0)
Open WD
Published Jan 02, 2026North Carolina • Lincoln
Rate
BRICKLAYER
Base $18.62Fringe $0.00
Rate
CARPENTER
Base $17.51Fringe $0.47
Rate
CEMENT MASON/CONCRETE FINISHER
Base $15.15Fringe $0.00
+27 more occupation rates in this WD
Davis-Baconstate match
NC20260088 (Rev 0)
Open WD
Published Jan 02, 2026North Carolina • Alamance, Anson, Cabarrus +14
Rate
BLASTER
Base $18.64Fringe $0.00
Rate
CEMENT MASON/CONCRETE FINISHER
Base $13.93Fringe $0.00
Rate
Telecommunications Technician
Base $15.19Fringe $1.25
+21 more occupation rates in this WD
Davis-Baconstate match
NC20260014 (Rev 0)
Open WD
Published Jan 02, 2026North Carolina • Alexander, Burke, Caldwell
Rate
IRONWORKER
Base $29.75Fringe $18.00
Rate
PIPEFITTER
Base $33.96Fringe $13.48
Rate
PLUMBER
Base $33.96Fringe $13.48
+19 more occupation rates in this WD
Davis-Baconstate match
NC20260019 (Rev 1)
Open WD
Published Jan 30, 2026North Carolina • Alamance, Alexander, Alleghany +97
Rate
CLASS A1
Base $48.48Fringe $15.34
Rate
b CLASS A2
Base $43.20Fringe $14.99
Rate
b CLASS B1
Base $41.93Fringe $14.90
+17 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
WAKE TECHNICAL COMMUNITY COLLEGE - CONSTRUCTION
Agency
Not available
Subagency
Not available
Office
Deborah Hutchins
Contracting Office Address
Not available

Description

Pavement replacement and maintenance for Lots H & P. Project will primarily include replacement of pavement for Lot H. Lot P may include pavement replacement, mill and overlay, or other methods of asphalt maintenance. Construction associated with the pavement replacement or maintenance may have impacts on sidewalks, curb & gutter, stripping, and drainage. Lots located at the Southern Wake Campus (SWC)

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.