RFQ# 26-0218 Camp Branch Greenway Feasibility and Design
Federal opportunity from TOWN OF HOLLY SPRINGS. Place of performance: NC. Response deadline: Mar 25, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
The Town of Holly Springs is seeking a Statement of Qualifications from experienced and licensed professional
engineering, planning, and design firms to assist with the multi-phase development of the approximately 1.21-mile
Camp Branch Greenway. This project primarily includes completing a comprehensive feasibility study, with the
possibility of additional phases including preliminary engineering and final design and permitting (100% construction
plans) for the proposed greenway corridor.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.