Skip to content
State Of Nc - Construction Office

North Carolina Department of Public Safety-North Carolina National Guard

Solicitation: Not available
Notice ID: ncevp_dda8a279c972098dc27263ae8b3f78854db3926e
DepartmentState Of Nc - Construction OfficeStateNCPostedMar 03, 2026, 12:00 AM UTCDueApr 02, 2026, 02:00 PM UTCCloses in 30 days

Federal opportunity from STATE OF NC - CONSTRUCTION OFFICE. Place of performance: NC. Response deadline: Apr 02, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$2,980,125,018
Sector total $2,980,125,018 • Share 100.0%
Live
Median
$158,160
P10–P90
$32,032$3,760,041
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($2,980,125,018)
Deal sizing
$158,160 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Place of Performance
Not listed — check the files for details.

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Published Jan 30, 2026
North Carolina • Alamance, Alexander, Alleghany +97
CLASS A1
Base: $48.48 • Fringe: $15.34
b CLASS A2
Base: $43.20 • Fringe: $14.99
b CLASS B1
Base: $41.93 • Fringe: $14.90
Match signal: state match
Published Jan 02, 2026
North Carolina • Watauga
PIPEFITTER (Excluding HVAC System Installation)
Base: $31.66 • Fringe: $12.69
BRICKLAYER
Base: $18.45 • Fringe: $4.18
CARPENTER (Drywall Hanging Only)
Base: $17.59 • Fringe: $2.31
Match signal: state match
Published Jan 02, 2026
North Carolina • Duplin, Lee, Lenoir +2
PIPEFITTER (Excluding HVAC System Installation)
Base: $31.66 • Fringe: $12.69
BRICKLAYER
Base: $19.09 • Fringe: $8.73
CARPENTER (Drywall Hanging Only)
Base: $18.13 • Fringe: $1.31
Match signal: state match
Published Jan 02, 2026
North Carolina • Chatham, Durham, Edgecombe +6
CARPENTER, Includes Form Work
Base: $13.98 • Fringe: $0.69
ELECTRICIAN
Base: $15.41 • Fringe: $3.13
LABORER: Common or General
Base: $10.35 • Fringe: $2.84
Match signal: state match

Point of Contact

Not available

Agency & Office

Department
STATE OF NC - CONSTRUCTION OFFICE
Agency
Not available
Subagency
Not available
Office
Shahgol Mostashari
Contracting Office Address
Not available

Description

Butner Facility Maintenance Shop 13 Repairs- This project consists of the renovation of the Butner Facility Maintenance Shop 13 Building (13,350 SF). The scope of the work in the existing building shall consist of demolishing four existing interior roll-up doors, existing ceiling grids, existing light fixtures, existing gutters and downspouts, existing mechanical, plumbing and electrical elements all to be replaced with new. Alternate 1 work consists of demolishing the existing doors, frames, and their associated parts in the main portion of the building and replacing them with new hollow metal doors and frames. As part of Alternate 2 work, the existing overhead coiling doors at the south exterior wall assembly shall be demolished and replaced with new overhead motorized coiling doors. As part of Alternate 3 work, the existing windows shall be demolished and replaced with new. The project includes all other work as shown, indicated or reasonably implied on the drawings and/or specifications for a complete, first-class job.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.