Skip to content
Orange Water & Sewer Authority

Laboratory Modifications

Solicitation: Not available
Notice ID: ncevp_807755980fe471b8a1d515557863b80c63c242ac
DepartmentOrange Water & Sewer AuthorityStateNCPostedFeb 17, 2026, 12:00 AM UTCDueMar 11, 2026, 03:00 PM UTCCloses in 14 days

Federal opportunity from ORANGE WATER & SEWER AUTHORITY. Place of performance: NC. Response deadline: Mar 11, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$88,279,370,037
Sector total $88,279,370,037 • Share 100.0%
Live
Median
$313,578
P10–P90
$29,200$18,600,000
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($88,279,370,037)
Deal sizing
$313,578 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Place of Performance
Not listed — check the files for details.

Point of Contact

Not available

Agency & Office

Department
ORANGE WATER & SEWER AUTHORITY
Agency
Not available
Subagency
Not available
Office
David Moore
Contracting Office Address
Not available

Description

Sealed Bids will be received by Orange Water and Sewer Authority from Bidders until 3:00 P.M., local time, on Wednesday, March 11, 2026, for CIP No. 272-63, Project: “Laboratory Modifications” at the Jones Ferry Water Treatment Plant, in the Administrative Offices, 400 Jones Ferry Road, Carrboro, North Carolina 27510. Bids will be received for a Single Prime Lump Sum General Construction Contract. The Contractor and all Subcontractors shall have valid North Carolina General Contractor’s Licenses for the type and value of the work to be performed. The Project consists of furnishing all materials, labor, equipment, tools, etc. unless otherwise specified, for the renovation of existing laboratory space to allow for the complete and operable installation of: Laboratory equipment to analyze for PFAS and other trace compounds at the Jones Ferry Road Water Treatment Plant (WTP) in Carrboro, NC and all associated appurtenances as described in the Specifications and as shown on the Drawings. The foregoing description shall not be construed as a complete description of all work required. Beginning on Wednesday, February 18, 2026, the Contract Documents will be on file in the in the Administrative Offices, 400 Jones Ferry Road, Carrboro, North Carolina. Printed copies of the Contract Documents are not available. Electronic copies will be transmitted to bidders by request through email, free of charge, by contacting Leigh Dudley at Dewberry Engineers Inc. at ldudley@dewberry.com. Partial sets of Contract Documents will not be made available. The Contract Documents may be viewed free of charge at the Administrative Offices, 400 Jones Ferry Road, Carrboro, North Carolina. Bidders are strongly encouraged to attend a non-mandatory Pre-Bid Conference at 11:00 A.M., local time, on Tuesday, February 24, 2026, at the Jones Ferry Water Treatment Plant, in the Administrative Offices, 400 Jones Ferry Road, Carrboro, North Carolina. Orange Water and Sewer Authority has adopted a minimum ten (10%) percent goal for participation by minority businesses in the total value of the work for this project in accordance with Section 143-128.2 of the General Statutes of North Carolina.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.