Skip to content
County Of Mecklenburg

Valerie C Woodard Building Deep Energy Retrofit Phase 2

Solicitation: Not available
Notice ID: ncevp_b66e79f55a20ca90baf69a2711c68db1019f6fee
DepartmentCounty Of MecklenburgStateNCPostedMay 19, 2026, 12:00 AM UTCDueJun 24, 2026, 02:00 PM UTCCloses in 30 daysBid range$497,650 - $589,808
Contract snapshot

Federal opportunity from COUNTY OF MECKLENBURG. Place of performance: NC. Response deadline: Jun 24, 2026.

Source
Open on official portal →
Solicitation
ncevp_b66e79f55a20ca90baf69a2711c68db1019f6fee
Performance
NC
Response
Jun 24, 2026, 02:00 PM UTC
Open on official portal →
Live POP
Place of performance
NC
Contracting office
Not listed

Point of Contact

Not available

Agency & Office

Department
COUNTY OF MECKLENBURG
Agency
Not available
Subagency
Not available
Office
Egidio Tavares
Contracting Office Address
Not available

Applicable wage determinations

Best public WD match for the notice location and scope.

Directory →
Best fitDavis-Baconstate match
NC20260083 (Rev 1)
Published May 18, 2026North Carolina • Davie, Forsyth, Stokes +1
8 occupation rates available in the full WD.
View more WD detail
3 more WD matches and 6 more rate previews.
Davis-BaconBest fitstate match
NC20260083 (Rev 1)
Open WD
Published May 18, 2026North Carolina • Davie, Forsyth, Stokes +1
Rate
TRUCK DRIVER
Base $13.19Fringe $1.84
Rate
OPERATOR: LOADER
Base $15.13Fringe $2.79
Rate
OPERATOR: BULLDOZER
Base $14.63Fringe $0.00
+5 more occupation rates in this WD
Davis-Baconstate match
NC20260108 (Rev 1)
Open WD
Published May 18, 2026North Carolina • Rowan
Rate
TRUCK DRIVER: SEMI-TRAILER TRUCK
Base $14.77Fringe $0.00
Rate
TRUCK DRIVER: DUMP TRUCK
Base $14.90Fringe $0.00
Rate
SPRINKLER FITTER (FIRE SPRINKLERS)
Base $13.71Fringe $0.00
+27 more occupation rates in this WD
Davis-Baconstate match
NC20260002 (Rev 1)
Open WD
Published May 18, 2026North Carolina • Catawba
Rate
IRONWORKER
Base $29.75Fringe $18.00
Rate
PIPEFITTER
Base $33.96Fringe $13.48
Rate
PLUMBER
Base $33.96Fringe $13.48
+18 more occupation rates in this WD
Davis-Baconstate match
NC20260081 (Rev 1)
Open WD
Published May 18, 2026North Carolina • Cumberland, Hoke
Rate
TRUCK DRIVER
Base $13.12Fringe $1.89
Rate
OPERATOR: LOADER
Base $15.13Fringe $2.79
Rate
OPERATOR: BULLDOZER
Base $14.63Fringe $0.00
+5 more occupation rates in this WD

Description

Sealed, hand-delivered proposals will be received until 2:00 pm EST, on Wednesday, June 24, 2026, in the office of Mecklenburg County Asset & Facility Management Department, 3205 Freedom Drive, Suite 6000, Charlotte, NC 28208, for the Valerie C Woodard Building Deep Energy Retrofit Phase 2 Project, at which time and place Bids will be opened and read aloud. Single-prime, lump sum bids will be taken for the construction project as indicated in the bidding documents. The project is located at 3205 Freedom Dr. Charlotte, NC 28208 and a mandatory pre-bid meeting shall be held there June 9, 2026 at 10am. Meeting will begin at Suite 6000. Prime General Contractors wishing to submit a bid must provide a MANDATORY written Letter-of-Interest to the County’s authorized Design Consultant at least 48 hours in advance of the bid opening in order to be placed on the official Bidders List for automatic distribution of potential addenda and offered consideration by the County as a responsive bidder. Bid, performance, and payment & material bonds are required. NC law and applicable regulations of various licensing boards apply. For Drawings with Specifications, please contact both: Julie Jackson and Cameron Sunkel, Gensler, 101 South Tryon St. Suite 2100, Charlotte, NC 28280, Phone: (704)377-2725, julie_jackson@gensler.com, and cameron_sunkel@gensler.com. Mecklenburg County reserves the right to waive technicalities and to reject any or all bids.

Advisory bid range

Pricing and bid posture

high confidence
$497,650 - $589,808

Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.

Calibrate full bid price →
Floor
$497,650
Target
$526,614
Premium
$589,808
Labor
$151,846
Direct
$180,550
Burden
$119,734
Fee + reserve
$62,064
Target $526,614Hybrid workpaper with explicit assumptions4 modeled rows

This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$3,508,452,282
Sector total $3,508,452,282 • Share 100.0%
Live
Median
$350,000
P10–P90
$32,556$3,256,200
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($3,508,452,282)
Deal sizing
$350,000 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.
Federal Bid Partners

Service match

Optional support routes matched to this notice after the core solicitation details.

Need help writing this bid?
Route this notice into proposal, compliance, and submission support without burying the solicitation record.
Open proposal plans

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.