Skip to content
County Of Mecklenburg

Fleet Management EV Charger Installation Project Mecklenburg County

Solicitation: Not available
Notice ID: ncevp_33f43de790496547d7d9f24c9353360cb9659868
DepartmentCounty Of MecklenburgStateNCPostedFeb 20, 2026, 12:00 AM UTCDueMar 17, 2026, 02:00 PM UTCCloses in 19 days

Federal opportunity from COUNTY OF MECKLENBURG. Place of performance: NC. Response deadline: Mar 17, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$68,699,272,131
Sector total $68,699,272,131 • Share 100.0%
Live
Median
$253,715
P10–P90
$29,763$10,909,709
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($68,699,272,131)
Deal sizing
$253,715 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Place of Performance
Not listed — check the files for details.

Point of Contact

Not available

Agency & Office

Department
COUNTY OF MECKLENBURG
Agency
Not available
Subagency
Not available
Office
Egidio Tavares
Contracting Office Address
Not available

Description

Sealed, hand-delivered proposals will be received until 2:00 PM, on Tuesday, March 17, 2026, in the office of Mecklenburg County Asset & Facility Management Department, 3205 Freedom Drive, Suite 6000, Charlotte, NC 28208, for the construction of FLEET MANAGEMENT EV CHARGERS. Single-prime Electrical Contractor, lump sum bids will be taken for construction as indicated in the bidding documents. The project is located at 900 W. 12th St.; Charlotte, NC 28206. A mandatory pre-bid meeting shall be held on at 10 am on Monday, March 2, 2026, at 900 W. 12th St.; Charlotte, NC 28206. Prime Electrical Contractors wishing to submit a bid for this project must provide a MANDATORY written Letter-of-Interest to the County’s authorized Design Consultant at least 48 hours in advance of the bid opening in order to be placed on the Official Bidders List for automatic distribution of potential addenda and offered consideration by the County as a responsive bidder. 5% Bid, 100% Performance, and Payment & Material bonds shall be required for this project. NC law and applicable regulations of various licensing boards apply. Mecklenburg County reserves the right to reject any or all proposals and to waive informalities or technicalities, as it may deem to be in its best interest. For Drawings with Specifications, please contact the design consultant: Contact: Louis Gerics | gerics@innovativedesign.net | (919)-832-6303|Innovative Design, Inc., Raleigh, NC, 27603.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.