Skip to content
County Of Brunswick

ITB: RE-ADVERTISEMENT Southport Evaluation and Rehabilitation of Wastewater System

Solicitation: Not available
Notice ID: ncevp_5c7d2bb9f183ba0bde01c36e00ae81fd52a3d942
DepartmentCounty Of BrunswickStateNCPostedFeb 18, 2026, 12:00 AM UTCDueFeb 23, 2026, 08:00 AM UTCExpired

Federal opportunity from COUNTY OF BRUNSWICK. Place of performance: NC. Response deadline: Feb 23, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$68,699,272,131
Sector total $68,699,272,131 • Share 100.0%
Live
Median
$253,715
P10–P90
$29,763$10,909,709
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($68,699,272,131)
Deal sizing
$253,715 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Place of Performance
Not listed — check the files for details.

Point of Contact

Not available

Agency & Office

Department
COUNTY OF BRUNSWICK
Agency
Not available
Subagency
Not available
Office
Robyn Beliveau
Contracting Office Address
Not available

Description

Pursuant to North Carolina General Statutes § 143-129 et. seq. and 2 C.F.R. 200.320(b)(1), Brunswick County (“County” or “Owner”) is soliciting sealed bids for the construction of: Southport Evaluation and Rehabilitation of Wastewater System, DWI Project Nos. CS370714-04 & SRP-W-ARP-0299. Sealed bids must be received by 3:00 p.m. ET on Thursday, March 5, 2026, in the Brunswick County Public Utilities Operations Center located at 250 Grey Water Road NE, Supply, NC 28462 and shortly thereafter the bids will be opened publicly and read aloud. The contract shall be Single Prime.

A general description of the work includes, without limitation: Rehabilitation of existing sewer infrastructure within the City of Southport, NC and new construction of approximately 9,000 linear feet of 8-inch sanitary sewer force main connecting Park Avenue Pump Station to the manifold force main connection on NC 211 in Southport.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.