ITB: Southport Evaluation and Rehabilitation of Wastewater System
Federal opportunity from COUNTY OF BRUNSWICK. Place of performance: NC. Response deadline: Jan 21, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
A general description of the work includes, without limitation: Rehabilitation of existing sewer infrastructure within the City of Southport, NC and new construction of approximately 9,000 linear feet of 8-inch sanitary sewer force main connecting Park Avenue Pump Station to the manifold force main connection on NC 211 in Southport.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.