Grass Maintenance Services for 14 Water Treatment Plant Sites
Federal opportunity from CITY OF ROCKY MOUNT. Place of performance: NC. Response deadline: Mar 12, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
The Water Treatment Plant has (7) water tanks and (3) booster stations on the list below to be mowed and trimmed
every (2) weeks during high growth periods. During periods of slow growth such as drought and early spring/late fall.
Contractor will be notified by WTP Maintenance Supervisor to delay service. Bushes, shrubs, grass, weeds, and vines
to be kept clear of all fence lines during the ENTIRE year. Flower beds are to be maintained free of volunteer monthly.
Trees and bushes are to be kept trimmed off all structures. All concrete curbs and sidewalks to be edged with each cut.
Contractor shall have been in the regular business of commercial lawn care for a minimum of (3) years, have a current
license for the State of North Carolina to spray herbicide and pesticide.
Contractor shall pick up all trash and other small limbs and debris that can be placed in a thirty-gallon trash bag without
running over it with the mower or weed trimmer. Contractor shall notify point of contact of any obstructions that are too
large for him to move.
Contractor shall spray herbicide in April and again 3 weeks after the first spraying. Spraying will be on all rocked
surfaces and between pavement and curbs at maximum rates allowed by law. Contractor shall spray around
protrusions, i.e.: guy wires, valve boxes, utility poles, buildings, fences, concrete structures with no more than a 4-inch
width of spray.
Contractor MUST notify maintenance supervisor by email within 48 hours of completion of cut or SHALL FORFEIT
PAY for that cycle of cuts. Text messages and phone calls will not be accepted as means of confirmation.
Contractors will be required to submit invoices no more than 30 days from the date of service, invoices must have each
location listed with the date of cut beside them.
This contract will be for March 1, 2026, through February 29, 2028. There will be an option for two one-year
extensions, if the extension prices stay the same or increase less than the CPI as published by the US Bureau of Labor
Statistics, and CRM and contractors agree to exercising these extensions. Cutting season will be from April 1 –
October 31 but may be adjusted based on growth.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.