Manhole Rehabilitation FY26
Federal opportunity from CITY OF ROCKY MOUNT. Place of performance: NC. Response deadline: Feb 05, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
The City of Rocky Mount and Water Resources Department is seeking responses from qualified licensed utility
contractors for continued efforts to maintain the collections system and to lessen the infiltration of stormwater run-off
and ground saturation into the sewer collection system.
The Contractor shall be licensed and bonded in North Carolina and shall use sufficient workmen and competent
supervisors in the execution of this portion of the work to ensure adequate and proper installation throughout.
This specification references standards from the American Society for Testing and Materials, such as: ASTM F1216
(Rehabilitation of Existing Pipelines and Conduits by the Inversion and Curing of a Resin-Impregnated Tube),
ASTM F1743 (Rehabilitation of Existing Pipelines and Conduits by Pulled-in-Place Installation of Cured-in-Place
Thermosetting Resin Pipe (CIPP)), ASTM D5813 (Cured-in-Place Thermosetting Resin Sewer Pipe), ASTM D790
(Test Methods for Flexural Properties of Un-reinforced and Reinforced Plastics and Electrical Insulating Materials),
and D2990 (Tensile, Compressive, and Flexural Creep and Creep-Rupture of Plastics) which are made a part
hereof by such reference and shall be the latest edition and revision thereof. In case of conflicting requirements
between this specification and these referenced documents, this specification will govern.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.