Water Pump Station Replacement Parts
Federal opportunity from CITY OF ROCKY MOUNT. Place of performance: NC. Response deadline: Mar 26, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 23 more rate previews.↓
Point of Contact
Agency & Office
Description
The purpose of this Request for Quotation (RFQ) is to obtain pricing from qualified vendors for the purchase of replacement pump parts and components for the City of Rocky Mount Wastewater Treatment Plant. The City’s Wastewater Treatment Division operates and maintains multiple pump systems that are critical to the reliable collection, conveyance, and treatment of wastewater. Routine maintenance and timely replacement of worn or damaged components are necessary to ensure the continued performance, efficiency, and reliability of these systems. The parts requested under this RFQ include various impellers, wear plates, seals, bearings, gaskets, flappers, and other associated components compatible with existing pump equipment currently in operation at the treatment facility. These components are required to support ongoing maintenance activities and to minimize system downtime.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.