Neuse River RRF Driveway Replacement Project
Federal opportunity from CITY OF RALEIGH. Place of performance: NC. Response deadline: Apr 07, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 20 more rate previews.↓
Point of Contact
Agency & Office
Description
Neuse River RRF Driveway Replacement Project: Milling of existing pavement as needed
- Replacement of the existing driveway base course utilizing Full Depth Reclamation (FDR)
- Placement of new asphalt base and finish courses
- Removal and reinstallation of detection loops for the plant chain link sliding access gate
- Temporary traffic control
- Misc. items
- Driveway length is approximately 1,700 lf by 22’ wide
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.