Neuse River Resource Recovery Facility - 2K AST Replacement
Federal opportunity from CITY OF RALEIGH. Place of performance: NC. Response deadline: Jun 23, 2026.
- Source
- Open on official portal →
- Solicitation
- ncevp_93320c81a7cb9457d16f51a8290ebe1b0e6b8896
- Performance
- NC
- Response
- Jun 23, 2026, 03:30 PM UTC
Point of Contact
Agency & Office
Applicable wage determinations
Best public WD match for the notice location and scope.
View more WD detail3 more WD matches and 6 more rate previews.↓
Description
Provide equipment and labor to remove existing 2000-gallon AST. Install new 2000-gallon UL 2085 Fireguard Double Walled AST; install 3" fill piping for remote fill; install product piping; install Wayne dispenser supplied by customer and connect to existing fuel controller. Haul and dispose of all debris.
Pricing and bid posture
Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.
This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
Service match
Optional support routes matched to this notice after the core solicitation details.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.