Readvertisement: Crabtree Creek Greenway – Lassiter Mill
Federal opportunity from CITY OF RALEIGH. Place of performance: NC. Response deadline: Mar 10, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
Stream restoration work, boardwalk demolition/reconstruction, 10’ greenway resurfacing and reconstruction along Crabtree Creek from Buncombe St to Hertford Rd; sidewalk and curb and gutter installation along Hertford Rd, 10’ Greenway on new alignment beneath Lassiter Mill Rd, plus 10’ multi-use path with curb and gutter along Lassiter Mill Rd from Lassiter Falls Cir to the existing greenway crossing
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.