WTP Facility Repairs Pkg
Federal opportunity from CITY OF GOLDSBORO. Place of performance: NC. Response deadline: Mar 31, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
Point of Contact
Agency & Office
Description
The City of Goldsboro Public Utilities Department Water Treatment Plant, located at 1201 Jordan Blvd, Goldsboro, NC 27530. b. The project consists of repairing window and door lintels, concrete encased beam repair and repair of wall cracks in the City Water Treatment Plant. The contractor will be responsible for conducting the repairs in accordance with the scope of work provided.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.