REPLACEMENT OF 3.0-MILLION-GALLON RAW WATER TANK AT THE CITY’S WATER TREATMENT PLANT Addendum - 1 & 2
Federal opportunity from CITY OF ELIZABETH CITY. Place of performance: NC. Response deadline: Mar 12, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
The Project consists of Replacement of 3.0-million-gallon Raw Water Reservoir Tank, and all else required, complete in every respect, tested and accepted, placed into operation, to the satisfaction of the Owner and Engineer. The foregoing description shall not be construed as a complete description of all work required.
Addendum 1 Issued 01.26.2026
1.) Due to the volume of questions received, the bid opening date will be moved to a new date that will be issued in Addenda 2.
2.) RFIs submitted on January 20th, 2026 will be addressed in Addendum 2.
Addendum 2 Issued 02.06.2026
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.