CAUSEWAY PARK RESTORATION
Federal opportunity from CITY OF ELIZABETH CITY. Place of performance: NC. Response deadline: Apr 07, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 23 more rate previews.↓
Point of Contact
Agency & Office
Description
PROJECT DESCRIPTION The Base Bid of the project consists of (1) removing the existing approximately 910 LF boardwalk and 4 uncovered platform structures off of Camden Causeway (Hwy 158) at Causeway Park; (2) rebuilding back approximately 685 LF of boardwalk and 3 platform structures 1 of which will be covered; (3) redefining the extents of the existing parking lot with a fresh layer of gravel and timber fencing; (4) adding 2 paved handicap accessible parking spots and (5) adding a floating kayak launch to 1 of the platform structures.
- Bid Opening: 04/07/2026
- Notice of Intent to Award: 04/10/2026
- Notice of Award: 04/21/2026
- Notice to Proceed: 04/30/2026
- Substantial Completion: 10/20/2026
- Final Completion: 10/31/2026
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.