Rea Road Widening (I-485 to William Pond Lane)
Federal opportunity from CITY OF CHARLOTTE. Place of performance: NC. Response deadline: Apr 07, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 29 more rate previews.↓
Point of Contact
Agency & Office
Description
This project aims to increase capacity and alleviate congestion along Rea Road between the I-485 ramps to Williams Pond Lane. The project length is approximately 0.25 miles. The work includes construction of concrete sidewalk, curb & gutter, curb ramps and driveways, drainage, grading, traffic control, asphalt pavement, and pavement markings. Bids must be submitted electronically via Bonfire Portal.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.