COLLETTSVILLE SCHOOL WWTP REPLACEMENT
Federal opportunity from CALDWELL COUNTY BOARD OF EDUCATION. Place of performance: NC. Response deadline: Mar 10, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
This work includes the demolition of the existing 0.010 MGD steel package plant and associated appurtenances, installation of Owner provided treatment equipment, pump station, connecting sewers, streambank stabilization, and other associated site improvements and appurtenances.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.