Skip to content
City of Charlotte

Fire Station 13 Roof Replacement Project

Solicitation: 269-2026-200
Notice ID: 75fe66b3b0a649713303c599738bd942
DepartmentCity of CharlotteStateNCPostedDueApr 21, 2026, 09:00 PM UTCCloses in 12 days

Federal opportunity from City of Charlotte. Place of performance: NC. Response deadline: Apr 21, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$7,205,695,420
Sector total $7,205,695,420 • Share 100.0%
Live
Median
$96,720
P10–P90
$28,298$2,037,759
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($7,205,695,420)
Deal sizing
$96,720 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Live POP
Place of performance
NC
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
NC20260101 (Rev 0)
Match signal: state matchOpen WD
Published Jan 02, 2026North Carolina • Forsyth
Rate
BRICKLAYER
Base $18.62Fringe $0.00
Rate
CARPENTER
Base $15.71Fringe $0.00
+29 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 29 more rate previews.
Davis-BaconBest fitstate match
NC20260101 (Rev 0)
Open WD
Published Jan 02, 2026North Carolina • Forsyth
Rate
BRICKLAYER
Base $18.62Fringe $0.00
Rate
CARPENTER
Base $15.71Fringe $0.00
Rate
CEMENT MASON/CONCRETE FINISHER
Base $15.52Fringe $0.00
+28 more occupation rates in this WD
Davis-Baconstate match
NC20260089 (Rev 0)
Open WD
Published Jan 02, 2026North Carolina • Caswell, Davidson, Iredell +6
Rate
BLASTER
Base $21.85Fringe $0.00
Rate
CEMENT MASON/CONCRETE FINISHER
Base $13.67Fringe $0.00
Rate
Telecommunications Technician
Base $14.96Fringe $1.07
+21 more occupation rates in this WD
Davis-Baconstate match
NC20260050 (Rev 0)
Open WD
Published Jan 02, 2026North Carolina • Alleghany
Rate
PIPEFITTER (Excluding HVAC System Installation)
Base $31.66Fringe $12.69
Rate
BRICKLAYER
Base $18.45Fringe $4.18
Rate
CARPENTER (Drywall Hanging Only)
Base $17.59Fringe $2.31
+18 more occupation rates in this WD
Davis-Baconstate match
NC20260019 (Rev 1)
Open WD
Published Jan 30, 2026North Carolina • Alamance, Alexander, Alleghany +97
Rate
CLASS A1
Base $48.48Fringe $15.34
Rate
b CLASS A2
Base $43.20Fringe $14.99
Rate
b CLASS B1
Base $41.93Fringe $14.90
+17 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
City of Charlotte
Agency
Not available
Subagency
Not available
Office
Procurement
Contracting Office Address
Not available

Description

Official Bonfire public listing for City of Charlotte. Reference 269-2026-200. Open the official portal for full documentation, attachments, and submission instructions.

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Mar 31, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

The City of Charlotte has announced the Fire Station 13 Roof Replacement Project under solicitation number 269-2026-200. The response deadline for proposals is set for April 21, 2026. Interested bidders should refer to the official Bonfire portal for comprehensive documentation and guidelines on submission.

roof replacementmunicipal roofingCharlotte constructionfire station renovation
What the buyer is trying to do

The City aims to replace the roof of Fire Station 13 to ensure it meets current safety and operational standards, contributing to the overall maintenance of municipal infrastructure.

Who should pursue this
  • General contractors with roofing expertise
  • Companies with experience in municipal projects
  • Local contractors familiar with Charlotte guidelines
Work breakdown
  • Site assessment
  • Roof removal
  • Installation of new roofing materials
  • Compliance with safety regulations
Response package checklist
  • Completed proposal form
  • Proof of insurance
  • Relevant project experience
  • Bid price breakdown
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Ensure compliance with local building codes
  • Adhere to safety and environmental regulations
Pricing strategy
  • Consider competitive but fair pricing based on market rates for roofing projects
  • Include contingencies for potential cost overruns
Teaming and subs
  • Local roofing subcontractors
  • Suppliers of roofing materials
  • Consultants for project management
Risks and watchouts
  • Potential delays due to weather conditions
  • Unforeseen structural issues during roof assessment
  • Regulatory compliance changes
Smart questions to ask
  • What are the existing issues with the current roof?
  • Are there specific materials preferred by the City?
  • What is the total budget for this project?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Detailed project specifications
  • Budget estimate for the project
  • Historical performance data of previous roofing contracts
  • Specific materials required for the roof replacement
  • Description of existing roof condition
  • Contact information for the project manager
  • List of mandatory certifications or qualifications needed to bid
  • Timeframe for project completion

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.