Skip to content
Tn

Asphalt Paving Project

Solicitation: Not available
Notice ID: 12d9d45698823da3d36843e67b50a7a4aa50851d
DepartmentTnStateTNPostedJan 23, 2026, 12:00 AM UTCDueFeb 19, 2026, 12:00 AM UTCExpired

Federal opportunity from TN. Place of performance: TN. Response deadline: Feb 19, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$386,765,285
Sector total $386,765,285 • Share 100.0%
Live
Median
$129,570
P10–P90
$32,637$689,094
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($386,765,285)
Deal sizing
$129,570 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Live POP
Place of performance
Tennessee
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
TN20260156 (Rev 1)
Match signal: state matchOpen WD
Published Jan 23, 2026Tennessee • Decatur, Dyer
Rate
ELECTRICIAN
Base $27.25Fringe $15.72
Rate
POWER EQUIPMENT OPERATOR (Crane)
Base $36.25Fringe $13.40
+11 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 11 more rate previews.
Davis-BaconBest fitstate match
TN20260156 (Rev 1)
Open WD
Published Jan 23, 2026Tennessee • Decatur, Dyer
Rate
ELECTRICIAN
Base $27.25Fringe $15.72
Rate
POWER EQUIPMENT OPERATOR (Crane)
Base $36.25Fringe $13.40
Rate
POWER EQUIPMENT OPERATOR Backhoe/Trackhoe/Excavator
Base $33.23Fringe $13.40
+10 more occupation rates in this WD
Davis-Baconstate match
TN20260170 (Rev 1)
Open WD
Published Jan 23, 2026Tennessee • McNairy, Stewart
Rate
ELECTRICIAN
Base $27.25Fringe $15.72
Rate
POWER EQUIPMENT OPERATOR (Crane)
Base $36.25Fringe $13.40
Rate
POWER EQUIPMENT OPERATOR Backhoe/Trackhoe/Excavator
Base $33.23Fringe $13.40
+10 more occupation rates in this WD
Davis-Baconstate match
TN20260127 (Rev 1)
Open WD
Published Jan 23, 2026Tennessee • Fayette
Rate
ELECTRICIAN
Base $36.75Fringe $16.19
Rate
Operating Engineers: Bulldozer, Crane, and Forklift
Base $33.15Fringe $13.62
Rate
LABORER: Common or General
Base $18.47Fringe $6.65
+5 more occupation rates in this WD
Davis-Baconstate match
TN20260130 (Rev 1)
Open WD
Published Jan 23, 2026Tennessee • Madison
Rate
ELECTRICIAN
Base $36.75Fringe $16.19
Rate
Operating Engineers: Bulldozer, Crane, and Forklift
Base $33.15Fringe $13.62
Rate
LABORER: Common or General
Base $18.47Fringe $6.65
+5 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
TN
Agency
Not available
Subagency
Not available
Office
TN
Contracting Office Address
Not available

Description

Federal opportunity from TN. Place of performance: TN. Response deadline: Feb 19, 2026.

Files

Files size/type shown when available.

No downloadable attachments detected for this notice.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Feb 14, 2026
Executive summary

The Asphalt Paving Project issued by the Tennessee agency is set to post on January 23, 2026, with a response deadline of February 19, 2026. This opportunity may encompass various aspects of asphalt paving, and the NAICS codes relevant to paving services will need to be identified for potential bidders. Interested contractors should be prepared to showcase their experience in similar projects to ensure a competitive bid.

What the buyer is trying to do

The buyer is seeking qualified contractors for an asphalt paving project, likely to enhance or maintain road infrastructure within the state of Tennessee.

Work breakdown
No work breakdown extracted.
Response package checklist
  • Company profile and relevant project experience.
  • Details of workforce and equipment available for the project.
  • Proposed timeline and pricing strategy.
Suggested keywords
asphalt pavingroad constructionTennessee paving projectinfrastructure maintenance
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • No specific description or scope of work provided for the asphalt paving project.
  • Lack of NAICS codes for related construction services.
  • No current performance period or detailed project requirements listed.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.