Skip to content
Sd

Green Substation Construction

Solicitation: Not available
Notice ID: a69106f7428565226342f5e381badfa3966bc794
DepartmentSdStateSDPostedJan 23, 2026, 12:00 AM UTCDueFeb 19, 2026, 12:00 AM UTCExpired

Federal opportunity from SD. Place of performance: SD. Response deadline: Feb 19, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$386,765,285
Sector total $386,765,285 • Share 100.0%
Live
Median
$129,570
P10–P90
$32,637$689,094
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($386,765,285)
Deal sizing
$129,570 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Live POP
Place of performance
South Dakota
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
SD20260001 (Rev 0)
Match signal: state matchOpen WD
Published Jan 30, 2026South Dakota • Aurora, Beadle, Bennett +63
Rate
ELECTRICIAN
Base $35.43Fringe $8.69
Rate
IRONWORKER Group 1
Base $26.93Fringe $0.00
+15 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 15 more rate previews.
Davis-BaconBest fitstate match
SD20260001 (Rev 0)
Open WD
Published Jan 30, 2026South Dakota • Aurora, Beadle, Bennett +63
Rate
ELECTRICIAN
Base $35.43Fringe $8.69
Rate
IRONWORKER Group 1
Base $26.93Fringe $0.00
Rate
Group 2
Base $28.97Fringe $0.00
+14 more occupation rates in this WD
Davis-Baconstate match
SD20260026 (Rev 1)
Open WD
Published Jan 16, 2026South Dakota • Lincoln
Rate
BRICKLAYER
Base $41.90Fringe $4.94
Rate
CARPENTER (Drywall Finishing/Taping, Drywall Hanging and Metal Stud Installation Only)
Base $36.34Fringe $17.15
Rate
ELEVATOR MECHANIC
Base $56.30Fringe $38.43
+13 more occupation rates in this WD
Davis-Baconstate match
SD20260004 (Rev 1)
Open WD
Published Jan 16, 2026South Dakota • Aurora
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR (Duct, Pipe & Mechanical System Insulation)
Base $55.34Fringe $34.03
Rate
BRICKLAYER
Base $38.16Fringe $5.59
Rate
ELEVATOR MECHANIC
Base $56.30Fringe $38.43
+13 more occupation rates in this WD
Davis-Baconstate match
SD20260017 (Rev 1)
Open WD
Published Jan 16, 2026South Dakota • Oglala Lakota
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR (Duct, Pipe & Mechanical System Insulation)
Base $55.34Fringe $34.03
Rate
BRICKLAYER
Base $33.58Fringe $4.60
Rate
POWER EQUIPMENT OPERATOR (1) Tower Crane
Base $34.38Fringe $18.71
+12 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
SD
Agency
Not available
Subagency
Not available
Office
SD
Contracting Office Address
Not available

Description

Federal opportunity from SD. Place of performance: SD. Response deadline: Feb 19, 2026.

Files

Files size/type shown when available.

No downloadable attachments detected for this notice.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Feb 14, 2026
Executive summary

The opportunity for Green Substation Construction posted on January 23, 2026, requires bidders to respond by February 19, 2026. This project is managed by the agency 'SD', which may indicate regional or thematic focus. Detailed specifications about the scope and resources needed for submission are currently unavailable, necessitating further inquiry.

What the buyer is trying to do

The buyer aims to construct a green substation, which likely involves sustainable technologies or practices.

Work breakdown
No work breakdown extracted.
Response package checklist
  • Submit a bid proposal by February 19, 2026
  • Include relevant project experience
  • Demonstrate knowledge of green construction practices
Suggested keywords
Green SubstationSustainable ConstructionElectrical InfrastructureConstruction Bids
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Detailed project specifications are not provided.
  • No solicitation number listed.
  • No specific deliverables mentioned.
  • Absence of a place of performance indicated.
  • Lack of relevant NAICS codes.
  • No information on set-aside programs.
  • Undefined period of performance.
  • Buyer website is not specified.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.