Skip to content
Mt

W.O. 26-23 Hogan's Slough Streambank Stabilization

Solicitation: Not available
Notice ID: f112439438855483c0842e0960478be362f2341d
DepartmentMtStateMTPostedJan 23, 2026, 12:00 AM UTCDueFeb 17, 2026, 12:00 AM UTCExpired

Federal opportunity from MT. Place of performance: MT. Response deadline: Feb 17, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$386,765,285
Sector total $386,765,285 • Share 100.0%
Live
Median
$129,570
P10–P90
$32,637$689,094
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($386,765,285)
Deal sizing
$129,570 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Live POP
Place of performance
Montana
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
MT20260080 (Rev 1)
Match signal: state matchOpen WD
Published Jan 30, 2026Montana • Beaverhead, Big Horn, Blaine +52
Rate
CARPENTER Carpenter
Base $36.49Fringe $14.33
Rate
Millwright
Base $40.45Fringe $21.25
+25 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 25 more rate previews.
Davis-BaconBest fitstate match
MT20260080 (Rev 1)
Open WD
Published Jan 30, 2026Montana • Beaverhead, Big Horn, Blaine +52
Rate
CARPENTER Carpenter
Base $36.49Fringe $14.33
Rate
Millwright
Base $40.45Fringe $21.25
Rate
CEMENT MASON/CONCRETE FINISHER
Base $33.41Fringe $16.51
+24 more occupation rates in this WD
Davis-Baconstate match
MT20260034 (Rev 1)
Open WD
Published Jan 30, 2026Montana • Glacier
Rate
Heat and Frost Insulator
Base $43.81Fringe $21.87
Rate
BOILERMAKER
Base $38.75Fringe $32.31
Rate
BRICKLAYER
Base $33.11Fringe $17.18
+23 more occupation rates in this WD
Davis-Baconstate match
MT20260048 (Rev 1)
Open WD
Published Jan 30, 2026Montana • Powell
Rate
Heat and Frost Insulator
Base $43.81Fringe $21.87
Rate
BOILERMAKER
Base $38.75Fringe $32.31
Rate
BRICKLAYER
Base $33.11Fringe $17.18
+19 more occupation rates in this WD
Davis-Baconstate match
MT20260078 (Rev 1)
Open WD
Published Jan 30, 2026Montana • Lake, Lincoln, Mineral +2
Rate
ELECTRICIAN
Base $41.21Fringe $17.98
Rate
POWER EQUIPMENT OPERATOR: (Zone 1) (1) A-frame truck Crane, oiler (except crane)
Base $23.47Fringe $10.40
Rate
Crane Oiler,Bulldozer, Roller (Dirt and Grade Compaction)
Base $23.94Fringe $10.40
+17 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
MT
Agency
Not available
Subagency
Not available
Office
MT
Contracting Office Address
Not available

Description

Federal opportunity from MT. Place of performance: MT. Response deadline: Feb 17, 2026.

Files

Files size/type shown when available.

No downloadable attachments detected for this notice.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Feb 14, 2026
Executive summary

The opportunity for W.O. 26-23 Hogan's Slough Streambank Stabilization from the MT agency opens on January 23, 2026, with a response deadline of February 17, 2026. This project focuses on streambank stabilization, which is essential for environmental protection and local infrastructure stability. Interested bidders should prepare their proposals in accordance with the project requirements, expected to be detailed further in associated documentation.

What the buyer is trying to do

The buyer aims to stabilize the streambank at Hogan's Slough, likely to prevent erosion and maintain the integrity of the surrounding environment.

Work breakdown
No work breakdown extracted.
Response package checklist
  • Company profile and relevant experience
  • Technical approach to streambank stabilization
  • Detailed pricing structure
  • Project timeline and team qualifications
Suggested keywords
streambank stabilizationerosion controlenvironmental engineeringMTHogan's Slough
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Detailed project specifications and requirements
  • Information on previous contract awards for similar work
  • Clarification on specific environmental regulations involved
  • Potential bidders list or incumbents
  • Any required permits or environmental assessments

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.