Skip to content
Mo

Vandiver Drive Sidewalk

Solicitation: Not available
Notice ID: e744c485fe25d25d3602e00b5880ec493bf83fee
DepartmentMoStateMOPostedJan 23, 2026, 12:00 AM UTCDueFeb 17, 2026, 12:00 AM UTCExpired

Federal opportunity from MO. Place of performance: MO. Response deadline: Feb 17, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$386,765,285
Sector total $386,765,285 • Share 100.0%
Live
Median
$129,570
P10–P90
$32,637$689,094
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($386,765,285)
Deal sizing
$129,570 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Live POP
Place of performance
Missouri
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
MO20260079 (Rev 1)
Match signal: state matchOpen WD
Published Jan 30, 2026Missouri • Platte
Rate
HEAT & FROST INSULATOR (Includes Duct, Pipe and Mechanical Systems)
Base $43.60Fringe $33.52
Rate
BRICKLAYER
Base $40.53Fringe $16.69
+25 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 25 more rate previews.
Davis-BaconBest fitstate match
MO20260079 (Rev 1)
Open WD
Published Jan 30, 2026Missouri • Platte
Rate
HEAT & FROST INSULATOR (Includes Duct, Pipe and Mechanical Systems)
Base $43.60Fringe $33.52
Rate
BRICKLAYER
Base $40.53Fringe $16.69
Rate
TILE SETTER
Base $34.09Fringe $20.36
+24 more occupation rates in this WD
Davis-Baconstate match
MO20260073 (Rev 1)
Open WD
Published Jan 30, 2026Missouri • Clinton
Rate
HEAT & FROST INSULATOR (Includes Duct, Pipe and Mechanical Systems)
Base $43.60Fringe $33.52
Rate
BRICKLAYER
Base $40.53Fringe $16.69
Rate
TILE SETTER
Base $34.09Fringe $20.36
+24 more occupation rates in this WD
Davis-Baconstate match
MO20260082 (Rev 1)
Open WD
Published Jan 30, 2026Missouri • Bates, Caldwell, Clay +3
Rate
HEAT & FROST INSULATOR (Includes Duct, Pipe and Mechanical Systems)
Base $43.60Fringe $33.52
Rate
BRICKLAYER
Base $40.53Fringe $16.69
Rate
TILE SETTER
Base $34.09Fringe $20.36
+24 more occupation rates in this WD
Davis-Baconstate match
MO20260081 (Rev 1)
Open WD
Published Jan 30, 2026Missouri • Andrew, Buchanan, De Kalb
Rate
HEAT & FROST INSULATOR (Includes Duct, Pipe and Mechanical Systems)
Base $43.60Fringe $33.52
Rate
BRICKLAYER
Base $40.53Fringe $16.69
Rate
TILE SETTER
Base $34.09Fringe $20.36
+21 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
MO
Agency
Not available
Subagency
Not available
Office
MO
Contracting Office Address
Not available

Description

Federal opportunity from MO. Place of performance: MO. Response deadline: Feb 17, 2026.

Files

Files size/type shown when available.

No downloadable attachments detected for this notice.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Feb 14, 2026
Executive summary

The opportunity involves the construction of a sidewalk along Vandiver Drive, posted by the Missouri state agency on January 23, 2026. Proposals are due by February 17, 2026, which gives potential bidders a limited timeframe to prepare competitive offers. This project may appeal to contractors specializing in civil engineering and infrastructure development, particularly those familiar with sidewalk construction.

What the buyer is trying to do

The buyer intends to enhance pedestrian accessibility and safety by constructing a new sidewalk along Vandiver Drive, thereby improving local infrastructure.

Work breakdown
  • Site assessment and preparation
  • Excavation and grading
  • Concrete pouring and finishing
  • Installation of curb and gutter
  • Site cleanup and restoration
Response package checklist
  • Completed bid proposal form
  • Relevant project experience documentation
  • Detailed pricing proposal
  • Proof of insurance and bonding
  • Timeline for project completion
Suggested keywords
sidewalk constructionVandiver Drivecivil engineeringMissouri infrastructurepedestrian access
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Specific project budget
  • Detailed project scope
  • Criteria for contractor selection
  • Project design specifications
  • Any previous studies or assessments conducted on Vandiver Drive
  • Regulatory permits required for construction
  • Potential environmental considerations

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.