Skip to content
Department of Transportation

MnDOT Maryland TS Fuel Island Replacement

Solicitation: Not available
Notice ID: mn_osp__10095183

Federal opportunity from Minnesota DOT - Maintenance • Minnesota Department of Transportation (MnDOT). Place of performance: MN. Response deadline: Mar 26, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$2,980,125,018
Sector total $2,980,125,018 • Share 100.0%
Live
Median
$158,160
P10–P90
$32,032$3,760,041
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($2,980,125,018)
Deal sizing
$158,160 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for MN
Live POP
Place of performance
St. Paul, MN • US
State: MN
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Published Jan 02, 2026
Minnesota • Anoka, Carver, Dakota +4
CARPENTER
Base: $40.63 • Fringe: $28.42
CARPENTER
Base: $36.71 • Fringe: $20.17
ELECTRICIAN
Base: $53.91 • Fringe: $36.48
Match signal: state match • county match
Published Jan 02, 2026
Minnesota • Todd
ARTICULATED HAULER
Base: $46.51 • Fringe: $26.90
ASBESTOS ABATEMENT WORKER
Base: $41.23 • Fringe: $25.99
BOILERMAKER
Base: $46.00 • Fringe: $31.93
Match signal: state match
Published Jan 02, 2026
Minnesota • Traverse
ARTICULATED HAULER
Base: $21.50 • Fringe: $0.00
ASBESTOS ABATEMENT WORKER
Base: $41.23 • Fringe: $25.99
BOILERMAKER
Base: $41.94 • Fringe: $29.99
Match signal: state match
Published Jan 02, 2026
Minnesota • Steele
ARTICULATED HAULER
Base: $38.13 • Fringe: $20.30
ASBESTOS ABATEMENT WORKER
Base: $41.23 • Fringe: $25.99
BOILERMAKER
Base: $46.00 • Fringe: $31.93
Match signal: state match

Point of Contact

Name
BuildingServicesContracts.DOT
Email
BuildingServicesContracts.DOT@state.mn.us
Phone
651-366-3019
Name
Jennifer Hoffman
Email
BuildingServicesContracts.DOT@state.mn.us
Phone
Not available

Agency & Office

Department
Minnesota Department of Transportation (MnDOT)
Agency
Minnesota DOT - Maintenance
Subagency
Minnesota DOT - Maintenance
Office
<BuildingServicesContracts.DOT@state.mn.us> 651-366-3019; Jennifer Hoffman <BuildingServicesContracts.DOT@state.mn.us>
Contracting Office Address
Not available

Description

This project has a 5% percent Targeted Group (TG), Economically Disadvantaged (ED), and Veteran-Owned (VO) Small Business (TG/ED/VO) subcontracting goals established. PROJECT ID: TB-91165 FY PUMA: 26-154977 RESPONSES FOR: RESPONSES FOR: Fuel Island Replacement at Maryland Truck Station 244 E. Maryland Av. St. Paul, MN, 555117 Ramsey County All responses to this solicitation must be submitted and received in the QuestCDN Plan Room no later than 2:00 PM CDT on March 26, 2026. Bids will only be received and accepted via the online electronic bid service through QuestCDN.com. Interested Parties can download the bid documents at QuestCDN Plan Room and click the online bidding button at the top of the advertisement to access the electronic bid qualifications and bid worksheet. Fax, email, and printed responses will not be accepted or considered. Responses received after end date and time will not be considered, even if errors or delays were caused by issues outside of responders’ control. All costs incurred in responding to this solicitation will be borne by the responder. Plans and Specifications may be viewed, without charge, on the Office of State Procurement website https://mn.gov/admin/osp/vendors/solicitations-and-contract-opportunities/construction-virtual-plan-room/ then click on “Construction Virtual Plan Room.” Plans and specifications can be downloaded per project for a non-refundable charge of $6.00. The ‘Download Delivery Fee Selection’ is charged to each plan holder once the download of bid documents is initiated. The ‘On‐line Bidding Fee Selection’ ‘Bidder Pays (min. $25.00)’ is an additional charge to bidders who submit an online bid at the time of bid close. Plan Holders will be notified via email as addenda are issued. Parties that download the plans and specifications and need to have them printed elsewhere are solely responsible for those printing costs. Paper copies of plans and specifications will not be distributed by the Owner or its agent(s). If you need assistance, please contact QuestCDN Customer Support at (952) 233-1632 or info@questcdn.com

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.