Bathroom Renovation
RFP from MOI • Mecosta-Osceola ISD. Place of performance: MI. Response deadline: Feb 25, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
Please contact
SITE INSPECTION
Please notify GDK of your intent to bid or not bid as soon as possible. This ensures you receive all current bidding documentation. Please email Lisa Knoll, lknoll@gdkconstruction.com .A construction pre-bid meeting will be held onsite at 15830 190th, Big Rapids, MI on February 17, at 3:30pm local time.
Contractors are required to park and enter the building on the North side See site map for location details.
All bidders are encouraged to attend.
RFI CUT OFF
All RFIs must be submitted by February 18, 2026 by 12:00 pm. Please submit to Dustin Hemmes at dhemmes@gdkconstruction.com.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.