Skip to content
Lakeview School District

Lakeview Batting Cage

Solicitation: RFP-LAKE-260000001285-1
Notice ID: mivss_a095da7a89ec90b7c7e3f2572634ca65858a3cd4
TypeRFPDepartmentLakeview School DistrictAgencyLakeStateMIPostedFeb 23, 2026, 12:00 AM UTCDueMar 10, 2026, 02:00 PM UTCCloses in 4 days

RFP from LAKE • Lakeview School District. Place of performance: MI. Response deadline: Mar 10, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$1,916,539,917
Sector total $1,916,539,917 • Share 100.0%
Live
Median
$350,000
P10–P90
$31,530$2,497,319
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($1,916,539,917)
Deal sizing
$350,000 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for MI
Live POP
Place of performance
Battle Creek, MI • 49015
State: MI
Contracting office
15 Arbor Street • Battle Creek, MI • 49015

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
MI20260089 (Rev 1)
Match signal: state matchOpen WD
Published Jan 23, 2026Michigan • Lapeer
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR
Base $40.00Fringe $23.65
Rate
BOILERMAKER
Base $43.50Fringe $36.74
+41 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 41 more rate previews.
Davis-BaconBest fitstate match
MI20260089 (Rev 1)
Open WD
Published Jan 23, 2026Michigan • Lapeer
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR
Base $40.00Fringe $23.65
Rate
BOILERMAKER
Base $43.50Fringe $36.74
Rate
BRICKLAYER
Base $38.00Fringe $26.49
+40 more occupation rates in this WD
Davis-Baconstate match
MI20260083 (Rev 1)
Open WD
Published Jan 23, 2026Michigan • Genesee
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR
Base $40.00Fringe $23.65
Rate
BOILERMAKER
Base $43.50Fringe $36.74
Rate
BRICKLAYER
Base $38.00Fringe $26.49
+29 more occupation rates in this WD
Davis-Baconstate match
MI20260057 (Rev 1)
Open WD
Published Jan 23, 2026Michigan • Genesee
Rate
CARPENTER, Includes Form Work
Base $36.46Fringe $23.69
Rate
ELECTRICIAN
Base $44.83Fringe $36.76
Rate
POWER EQUIPMENT OPERATOR GROUP 1
Base $45.98Fringe $25.25
+24 more occupation rates in this WD
Davis-Baconstate match
MI20260013 (Rev 1)
Open WD
Published Jan 23, 2026Michigan • Genesee
Rate
CARPENTER
Base $36.46Fringe $23.69
Rate
ELECTRICIAN
Base $35.62Fringe $22.03
Rate
OPERATOR: Power Equipment GROUP 1
Base $48.98Fringe $25.25
+15 more occupation rates in this WD

Point of Contact

Name
Laura McFadden
Email
lmcfadden@lakeviewspartans.org
Phone
(269) 565-2404

Agency & Office

Department
Lakeview School District
Agency
LAKE
Subagency
LAKE
Office
Laura McFadden
Contracting Office Address
15 Arbor Street
Battle Creek, MI
49015

Description

Lakeview Batting Cage

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.