Skip to content
Edwardsburg Public Schools

Filter First Bottle Stations

Solicitation: RFP-EDPS-260000001260-1
Notice ID: mivss_3af8af99e03bcc1b231b9445e88892c97e499609
TypeRFPDepartmentEdwardsburg Public SchoolsAgencyEdpsStateMIPostedFeb 20, 2026, 12:00 AM UTCDueMar 09, 2026, 05:00 PM UTCCloses in 3 days

RFP from EDPS • Edwardsburg Public Schools. Place of performance: MI. Response deadline: Mar 09, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$1,916,539,917
Sector total $1,916,539,917 • Share 100.0%
Live
Median
$350,000
P10–P90
$31,530$2,497,319
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($1,916,539,917)
Deal sizing
$350,000 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for MI
Live POP
Place of performance
Edwardsburg, MI • 49112
State: MI
Contracting office
69410 Section Street • Edwardsburg, MI • 49112

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
MI20260151 (Rev 1)
Match signal: state matchOpen WD
Published Jan 23, 2026Michigan • Shiawassee
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR
Base $40.00Fringe $23.65
Rate
BOILERMAKER
Base $43.50Fringe $37.64
+36 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 36 more rate previews.
Davis-BaconBest fitstate match
MI20260151 (Rev 1)
Open WD
Published Jan 23, 2026Michigan • Shiawassee
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR
Base $40.00Fringe $23.65
Rate
BOILERMAKER
Base $43.50Fringe $37.64
Rate
BRICKLAYER
Base $38.00Fringe $26.49
+35 more occupation rates in this WD
Davis-Baconstate match
MI20260067 (Rev 1)
Open WD
Published Jan 23, 2026Michigan • Muskegon
Rate
CARPENTER, Includes Form Work
Base $31.50Fringe $21.15
Rate
POWER EQUIPMENT OPERATOR GROUP 1
Base $45.98Fringe $25.25
Rate
GROUP 2
Base $41.25Fringe $25.25
+25 more occupation rates in this WD
Davis-Baconstate match
MI20260057 (Rev 1)
Open WD
Published Jan 23, 2026Michigan • Genesee
Rate
CARPENTER, Includes Form Work
Base $36.46Fringe $23.69
Rate
ELECTRICIAN
Base $44.83Fringe $36.76
Rate
POWER EQUIPMENT OPERATOR GROUP 1
Base $45.98Fringe $25.25
+24 more occupation rates in this WD
Davis-Baconstate match
MI20260013 (Rev 1)
Open WD
Published Jan 23, 2026Michigan • Genesee
Rate
CARPENTER
Base $36.46Fringe $23.69
Rate
ELECTRICIAN
Base $35.62Fringe $22.03
Rate
OPERATOR: Power Equipment GROUP 1
Base $48.98Fringe $25.25
+15 more occupation rates in this WD

Point of Contact

Name
Gail Enders
Email
genders@goeddies.com
Phone
(269) 663-1042

Agency & Office

Department
Edwardsburg Public Schools
Agency
EDPS
Subagency
EDPS
Office
Gail Enders
Contracting Office Address
69410 Section Street
Edwardsburg, MI
49112

Description

Filter First Bottle Stations

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.