RFQ May Brook Road Infrastructure Engineering Design Project Town of Holland
Federal opportunity from PVPC1 - Pioneer Valley Planning Commission • Pioneer Valley Planning Commission. Place of performance: MA. Response deadline: Feb 27, 2026. Industry: NAICS UNSPSC 81-10-15.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
More in NAICS UNSPSC 81-10-15
Description
The Town of Holland has been awarded funds from the FY22/23 Massachusetts Executive Office of Housing and Livable Communities CDBG program. On behalf of the Town, PVPC is putting out an RFQ to receive responses for professional engineering design services for drainage, improved stormwater management, and full depth roadway grading and pavement reclamation on May Brook Road in Holland. To request an electronic copy of the RFQ, please contact Sue Ortiz at sortiz@pvpc.org.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The Town of Holland is seeking professional engineering design services for the May Brook Road Infrastructure Engineering Design Project, focusing on drainage, stormwater management, and roadway improvements. This RFQ is issued by the Pioneer Valley Planning Commission (PVPC) under funds from the FY22/23 Massachusetts Executive Office of Housing and Livable Communities CDBG program. The response deadline is February 27, 2026, allowing ample time for interested bidders to prepare their proposals.
The Town of Holland aims to enhance infrastructure through professional engineering services that address drainage and stormwater management while improving the roadway on May Brook Road.
- Professional engineering design services
- Drainage design
- Stormwater management improvement
- Full depth roadway grading design
- Pavement reclamation specifications
- Completed RFQ response form
- Firm qualifications and experience
- Relevant project examples
- Team resumes
- Cost proposal
Source coverage notes
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Detailed budget information for the project
- Specific project timeline for deliverables
- Local regulations surrounding drainage projects
- Existing infrastructure assessments
- Information on stakeholder involvement
- Contact for project-related inquiries (other than Sue Ortiz)
- Criteria for evaluating RFQ submissions
- Any prior studies or assessments of May Brook Road
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.