Forestale School & Oak Ridge School Boiler Replacements
Federal opportunity from SDW03 - School Dept • Town of Sandwich. Place of performance: MA. Response deadline: Feb 17, 2026. Industry: NAICS UNSPSC 72-15-10.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
More in NAICS UNSPSC 72-15-10
Description
Forestdale and Oak Ridge Elementary Boiler Replacement Project
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The Forestale School & Oak Ridge School Boiler Replacement project involves the replacement of boilers specifically in the Forestdale and Oak Ridge Elementary schools under the School Department (SDW03). The project has a response deadline set for February 17, 2026, providing ample time for prospective bidders to prepare their proposals. Detailed requirements and specifications can be found on the provided bid link.
They are seeking qualified contractors to carry out the boiler replacements at two educational facilities, ensuring efficient heating systems are installed and operational for the school environment.
- Assess existing boiler systems at Forestdale and Oak Ridge schools.
- Design new boiler specifications compliant with educational facility standards.
- Procure and install new boiler systems.
- Conduct testing and verification of system performance post-installation.
- Detailed project proposal including timelines and milestones.
- Company qualifications and project experience documentation.
- Cost estimates broken down by labor, materials, and overhead.
- Proof of insurance and bonding capacity.
Source coverage notes
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Detailed technical specifications for the new boilers.
- Budget range for the project.
- Timeline for existing boiler removal and installation.
- Specific permitting requirements location-specific.
- Evaluation criteria for bids.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.