Skip to content
Town of Franklin

IFB-Pine St. and Beech St. Waterline Improvements Project

Solicitation: Not available
Notice ID: ma_commbuys_ebd3067607431a9919af
NAICS UNSPSC 72-14-11DepartmentTown of FranklinAgencyCPO001 - Town of Franklin Purchasing DepartmentStateMAPostedDueMar 20, 2026, 09:00 AM UTCCloses in 16 days

Federal opportunity from CPO001 - Town of Franklin Purchasing Department • Town of Franklin. Place of performance: MA. Response deadline: Mar 20, 2026. Industry: NAICS UNSPSC 72-14-11.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$3,261,759,290
Sector total $3,261,759,290 • Share 100.0%
Live
Median
$275,770
P10–P90
$32,298$4,646,416
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($3,261,759,290)
Deal sizing
$275,770 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for MA
Live POP
Place of performance
Pam Vickery 355 East Central Street Franklin, MA 02038 US Email: pvickery@franklinma.gov Phone: (508) 520-4866 FAX: (508) 541-5253
State: MA
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Published Jan 02, 2026
Massachusetts • Hampden
POWER EQUIPMENT OPERATOR Group 1
Base: $57.83 • Fringe: $33.70
Group 2
Base: $57.18 • Fringe: $33.70
POWER EQUIPMENT OPERATOR Group 1
Base: $42.88 • Fringe: $31.04
Match signal: state match
Published Jan 02, 2026
Massachusetts • Middlesex
ELECTRICIAN
Base: $66.17 • Fringe: $37.08
POWER EQUIPMENT OPERATOR Group 1
Base: $57.83 • Fringe: $33.70
Group 2
Base: $57.18 • Fringe: $33.70
Match signal: state match
Published Jan 02, 2026
Massachusetts • Franklin
CARPENTER
Base: $43.33 • Fringe: $27.82
Power equipment operators: (1) Backhoe/Excavator/Trackhoe
Base: $42.88 • Fringe: $31.04
A (1) Loader
Base: $42.88 • Fringe: $31.04
Match signal: state match
Published Jan 02, 2026
Massachusetts • Suffolk
ELECTRICIAN (Includes Traffic Signalization)
Base: $66.17 • Fringe: $37.08
POWER EQUIPMENT OPERATOR Group 1
Base: $57.83 • Fringe: $33.70
Group 2
Base: $57.18 • Fringe: $33.70
Match signal: state match

Point of Contact

Not available

Agency & Office

Department
Town of Franklin
Agency
CPO001 - Town of Franklin Purchasing Department
Subagency
CPO001 - Town of Franklin Purchasing Department
Office
Pamela Vickery
Contracting Office Address
Not available

More in NAICS UNSPSC 72-14-11

Description

In accordance with MGL c. 30 section 39m, the Town of Franklin wishes to retain the services of a construction firm for the purposes of constructing approximately 5,550 feet of waterline improvements along Pine Street and Beech Street within the Town of Franklin. The proposed work on Pine Street will represent the base bid and the proposed work on Beech Street will be evaluated as an additive alternate. Bid Documents are available from the Town website: https://franklinma.gov/bids.aspx

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Mar 04, 2026
Executive summary

The Town of Franklin is seeking a construction firm to execute waterline improvements along Pine and Beech Streets, totaling approximately 5,550 feet. The project includes a base bid for Pine Street and an additive alternate for Beech Street. Interested bidders can obtain bid documents from the Town's website.

What the buyer is trying to do

The Town of Franklin aims to enhance its water infrastructure by constructing new waterline improvements along specified streets, focusing first on Pine Street as the base bid and considering Beech Street as an optional upgrade.

Work breakdown
  • Construction of 5,550 feet of waterline improvements
  • Completion of base bid work on Pine Street
  • Optional additive alternate work on Beech Street
Response package checklist
  • Completed bid proposal form
  • Detailed project plan and timeline
  • Qualifications and experience documentation
  • Cost estimate for both base and alternate bids
Suggested keywords
waterline improvementsconstruction bidmunicipal infrastructurePine StreetBeech Street
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Specific bid proposal form requirements
  • Details on the evaluation criteria for the additive alternate
  • Any pre-bid meeting information
  • Clarification on permit requirements
  • Current utility plans for the project area

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.