Skip to content
Worcester State University

WSU 26-10 Parking Garage Repairs

Solicitation: Not available
Notice ID: ma_commbuys_dad0c4f4ed2a805562c9
NAICS 72, 12, 11, 30, 15, 00, 32, 70, 17, 18DepartmentWorcester State UniversityAgency1113CONVD - Worcester State UniversityStateMAPostedDueMar 11, 2026, 02:00 PM UTCExpired

Federal opportunity from 1113CONVD - Worcester State University • Worcester State University. Place of performance: MA. Response deadline: Mar 11, 2026. Industry: NAICS 72, 12, 11, 30, 15, 00, 32, 70, 17, 18.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$7,205,695,420
Sector total $7,205,695,420 • Share 100.0%
Live
Median
$96,720
P10–P90
$28,298$2,037,759
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($7,205,695,420)
Deal sizing
$96,720 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for MA
Live POP
Place of performance
Central Receiving/Stockroom 486 Chandler Street Worcester, MA 01602 US Email: wsu_stockroom@worcester.edu Phone: (508) 929-8570
State: MA
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
MA20260010 (Rev 0)
Match signal: state matchOpen WD
Published Jan 02, 2026Massachusetts • Berkshire, Franklin, Hampden +1
Rate
BOILERMAKER
Base $50.62Fringe $28.82
Rate
BRICKLAYER BRICKLAYERS; CEMENT MASONS; PLASTERERS; STONE MASONS; MARBLE, TILE & TERRAZZO WORKERS
Base $50.81Fringe $32.27
+64 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 64 more rate previews.
Davis-BaconBest fitstate match
MA20260010 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Berkshire, Franklin, Hampden +1
Rate
BOILERMAKER
Base $50.62Fringe $28.82
Rate
BRICKLAYER BRICKLAYERS; CEMENT MASONS; PLASTERERS; STONE MASONS; MARBLE, TILE & TERRAZZO WORKERS
Base $50.81Fringe $32.27
Rate
DIVER TENDER
Base $61.70Fringe $35.47
+63 more occupation rates in this WD
Davis-Baconstate match
MA20260011 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Franklin
Rate
Insulator/asbestos worker (Includes the application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems.)
Base $44.36Fringe $36.63
Rate
BOILERMAKER
Base $50.62Fringe $28.82
Rate
BRICKLAYER BRICKLAYERS; CEMENT MASONS; PLASTERERS; STONE MASONS; MARBLE, TILE & TERRAZZO WORKERS
Base $50.81Fringe $32.27
+54 more occupation rates in this WD
Davis-Baconstate match
MA20260019 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Hampden
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
Rate
Group 2
Base $57.18Fringe $33.70
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $42.88Fringe $31.04
+21 more occupation rates in this WD
Davis-Baconstate match
MA20260007 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Franklin
Rate
CARPENTER
Base $43.33Fringe $27.82
Rate
Power equipment operators: (1) Backhoe/Excavator/Trackhoe
Base $42.88Fringe $31.04
Rate
A (1) Loader
Base $42.88Fringe $31.04
+8 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
Worcester State University
Agency
1113CONVD - Worcester State University
Subagency
1113CONVD - Worcester State University
Office
WSU Bids Desk
Contracting Office Address
Not available

Description

Worcester State University is soliciting proposals for the following: WSU 26-10 Parking Garage Repairs. Please log in to projectdog.com and search for project # 872161.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Feb 18, 2026
Client-ready brief
Executive summary
high confidencegpt 4o mini

Worcester State University is seeking proposals for the WSU 26-10 Parking Garage Repairs, with a response deadline set for March 11, 2026. Interested parties need to log in to projectdog.com to access project details under #872161. This opportunity presents a target for firms with experience in parking facility renovation and repair projects.

Worcester State UniversityParking Garage RepairsConstruction BidFacility Renovation
What the buyer is trying to do

The buyer aims to select a qualified contractor to perform necessary repairs for the parking garage at Worcester State University, ensuring the facility meets safety and usability standards.

Who should pursue this
  • Contractors specializing in parking facility repairs
  • Construction firms with prior experience in similar projects
  • Bidders with a proven safety record in construction
Work breakdown
  • Assessment of existing parking garage conditions
  • Preparation of detailed repair plans
  • Execution of parking garage repairs
  • Compliance with safety regulations during project execution
  • Final inspection and approval process
Response package checklist
  • Completed proposal form
  • Company qualifications and relevant project experience
  • Schedule of proposed repairs
  • Cost estimate
  • Warranty terms for work performed
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Adherence to local safety regulations is mandatory
  • Compliance with all Massachusetts construction codes
Pricing strategy
  • Consider competitive pricing while ensuring quality of repairs
  • Itemize costs for transparency and easier comparison
Teaming and subs
  • Consider teaming with structural engineers for specialized assessments
  • Use local subcontractors to meet community engagement goals
Risks and watchouts
  • Potential delays due to unforeseen structural issues
  • Budget overruns if repairs exceed initial assessments
  • Regulatory compliance issues leading to project stoppages
Smart questions to ask
  • What specific repairs are most critical for project success?
  • Are there any existing reports on the structural condition of the garage?
  • What is the expected timeline for project completion once commenced?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • No specifics on the types of repairs needed
  • No details on the budget range for the project
  • Lack of information regarding any previous assessments of the garage
  • No contact information for the project manager
  • No historical performance data on contracted repairs

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.