Skip to content
Town of Holliston

Flagg Field Recreation Construction

Solicitation: Not available
Notice ID: ma_commbuys_d077abc773ca74ca14e8
NAICS UNSPSC 72-14-13DepartmentTown of HollistonAgencyHOLLPARK - Park and RecStateMAPostedDueMar 27, 2026, 11:00 AM UTCCloses in 15 days

Federal opportunity from HOLLPARK - Park and Rec • Town of Holliston. Place of performance: MA. Response deadline: Mar 27, 2026. Industry: NAICS UNSPSC 72-14-13.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$386,765,285
Sector total $386,765,285 • Share 100.0%
Live
Median
$129,570
P10–P90
$32,637$689,094
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($386,765,285)
Deal sizing
$129,570 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for MA
Live POP
Place of performance
Travis Ahern 703 Washington Street Holliston, MA 01746 US Email: ahernt@holliston.k12.ma.us Phone: (508) 429-0608 FAX: (508) 429-0642
State: MA
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
MA20260009 (Rev 0)
Match signal: state matchOpen WD
Published Jan 02, 2026Massachusetts • Dukes, Nantucket
Rate
BOILERMAKER
Base $50.62Fringe $28.82
Rate
Marble & Tile Finisher
Base $49.32Fringe $35.26
+46 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 46 more rate previews.
Davis-BaconBest fitstate match
MA20260009 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Dukes, Nantucket
Rate
BOILERMAKER
Base $50.62Fringe $28.82
Rate
Marble & Tile Finisher
Base $49.32Fringe $35.26
Rate
Marble, Tile & Terrazzo Workers
Base $64.52Fringe $37.51
+45 more occupation rates in this WD
Davis-Baconstate match
MA20260016 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Berkshire
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
Rate
Group 2
Base $57.18Fringe $33.70
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $42.88Fringe $31.04
+22 more occupation rates in this WD
Davis-Baconstate match
MA20260021 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Middlesex
Rate
ELECTRICIAN
Base $66.17Fringe $37.08
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
Rate
Group 2
Base $57.18Fringe $33.70
+21 more occupation rates in this WD
Davis-Baconstate match
MA20260007 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Franklin
Rate
CARPENTER
Base $43.33Fringe $27.82
Rate
Power equipment operators: (1) Backhoe/Excavator/Trackhoe
Base $42.88Fringe $31.04
Rate
A (1) Loader
Base $42.88Fringe $31.04
+8 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
Town of Holliston
Agency
HOLLPARK - Park and Rec
Subagency
HOLLPARK - Park and Rec
Office
Chris Meo
Contracting Office Address
Not available

More in NAICS UNSPSC 72-14-13

Description

Flagg Field Recreation Construction

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Mar 04, 2026
Executive summary

The Flagg Field Recreation Construction opportunity is issued by HOLLPARK - Park and Rec, targeting improvements at Flagg Field. The response deadline for submissions is set for March 27, 2026. This project falls under NAICS category UNSPSC 72-14-13, focusing on recreation and sports facilities.

What the buyer is trying to do

HOLLPARK is looking to undertake construction projects that enhance recreational facilities at Flagg Field, which may include upgrades or new installations to improve community engagement and usage.

Work breakdown
  • Site preparation and clearing
  • Construction of recreational facilities
  • Installation of safety features
  • Landscaping and beautification
  • Finishing touches and inspections
Response package checklist
  • Completed bid proposal form
  • List of relevant experience
  • References from similar projects
  • Financial statements
  • Insurance documentation
Suggested keywords
Flagg FieldRecreation ConstructionPark ImprovementsHOLLPARKCommunity Development
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Detailed scope of construction work
  • Specific budget ranges
  • Local competition landscape
  • Site plans or design proposals
  • Community feedback
  • Any required certifications or qualifications
  • Potential funding sources
  • Permitting requirements

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.