Skip to content
Town of Littleton

Roof top HVAC Units

Solicitation: Not available
Notice ID: ma_commbuys_bde0308016f010b07dc2
NAICS UNSPSC 40-10-00DepartmentTown of LittletonAgencySch300 - Littleton Public SchoolsStateMAPostedDueMar 04, 2026, 01:00 PM UTCCloses in 10 days

Federal opportunity from SCH300 - LITTLETON PUBLIC SCHOOLS • Town of Littleton. Place of performance: MA. Response deadline: Mar 04, 2026. Industry: NAICS UNSPSC 40-10-00.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$546,655,675
Sector total $546,655,675 • Share 100.0%
Live
Median
$97,181
P10–P90
$33,967$992,402
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($546,655,675)
Deal sizing
$97,181 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

Map for MA
Live POP
Place of performance
CHERYL TEMPLE 55 RUSSELL ST LITTLETON, MA 01460 US Email: SMARK@LITTLETONPS.ORG Phone: (978) 486-8938
State: MA
Contracting office
Not listed

Point of Contact

Not available

Agency & Office

Department
Town of Littleton
Agency
SCH300 - LITTLETON PUBLIC SCHOOLS
Subagency
SCH300 - LITTLETON PUBLIC SCHOOLS
Office
Steve Mark
Contracting Office Address
Not available

More in NAICS UNSPSC 40-10-00

Description

Town of Littleton, School Department is seeking sealed bid for replacement of Roof top units on the Littleton Middle School.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Feb 21, 2026
Executive summary

The Littleton Public Schools is soliciting sealed bids for the replacement of rooftop HVAC units at Littleton Middle School. This project aims to enhance the climate control within the school, ensuring a comfortable environment for students and staff. Bids are due by March 4, 2026, providing ample time for preparation.

What the buyer is trying to do

Replace existing rooftop HVAC units at Littleton Middle School to improve air quality and comfort in educational facilities.

Work breakdown
  • Evaluate existing HVAC systems
  • Design new rooftop units
  • Procure new HVAC units
  • Install new systems
  • Test and validate system performance
Response package checklist
  • Completed bid form
  • Copy of contractor's license
  • Proof of insurance
  • Technical specifications for proposed units
  • Warranty information
Suggested keywords
HVAC replacementRoof top unitsLittleton Public SchoolsSchool HVAC systems
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Exact specifications of HVAC units needed.
  • Information on existing HVAC system.
  • Details regarding installation requirements.
  • Budget constraints for the project.
  • Any regulations regarding school facility improvements.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.