Skip to content
Department of Transportation

608940 WESTON FAP No. HSI-0036(022)X Intersection Improvements Boston Post Road (Route 20) at Wel

Solicitation: Not available
Notice ID: ma_commbuys_b7cc4a9fe06dffaf0ec1
NAICS 72, 14, 10Set-AsideSBPP Eligible: YESDepartmentDepartment of TransportationAgency0h100 - HighwayStateMAPostedDueApr 28, 2026, 02:00 PM UTCCloses in 19 days

Federal opportunity from 0H100 - HIGHWAY • Department of Transportation. Place of performance: MA. Response deadline: Apr 28, 2026. Industry: NAICS 72, 14, 10.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$1,606,932,264
Sector total $1,606,932,264 • Share 100.0%
Live
Median
$85,110
P10–P90
$27,155$718,615
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($1,606,932,264)
Deal sizing
$85,110 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for MA
Live POP
Place of performance
Construction Unit 10 Park Plaza Boston, MA 02116 US Email: Noname@state.ma.us Phone: (999) 999-9999
State: MA
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
MA20260010 (Rev 0)
Match signal: state matchOpen WD
Published Jan 02, 2026Massachusetts • Berkshire, Franklin, Hampden +1
Rate
BOILERMAKER
Base $50.62Fringe $28.82
Rate
BRICKLAYER BRICKLAYERS; CEMENT MASONS; PLASTERERS; STONE MASONS; MARBLE, TILE & TERRAZZO WORKERS
Base $50.81Fringe $32.27
+64 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 64 more rate previews.
Davis-BaconBest fitstate match
MA20260010 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Berkshire, Franklin, Hampden +1
Rate
BOILERMAKER
Base $50.62Fringe $28.82
Rate
BRICKLAYER BRICKLAYERS; CEMENT MASONS; PLASTERERS; STONE MASONS; MARBLE, TILE & TERRAZZO WORKERS
Base $50.81Fringe $32.27
Rate
DIVER TENDER
Base $61.70Fringe $35.47
+63 more occupation rates in this WD
Davis-Baconstate match
MA20260011 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Franklin
Rate
Insulator/asbestos worker (Includes the application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems.)
Base $44.36Fringe $36.63
Rate
BOILERMAKER
Base $50.62Fringe $28.82
Rate
BRICKLAYER BRICKLAYERS; CEMENT MASONS; PLASTERERS; STONE MASONS; MARBLE, TILE & TERRAZZO WORKERS
Base $50.81Fringe $32.27
+54 more occupation rates in this WD
Davis-Baconstate match
MA20260019 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Hampden
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
Rate
Group 2
Base $57.18Fringe $33.70
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $42.88Fringe $31.04
+21 more occupation rates in this WD
Davis-Baconstate match
MA20260007 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Franklin
Rate
CARPENTER
Base $43.33Fringe $27.82
Rate
Power equipment operators: (1) Backhoe/Excavator/Trackhoe
Base $42.88Fringe $31.04
Rate
A (1) Loader
Base $42.88Fringe $31.04
+8 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
Department of Transportation
Agency
0H100 - HIGHWAY
Subagency
0H100 - HIGHWAY
Office
Alex Deng
Contracting Office Address
Not available

Description

Do Not Use COMMBUYS to Bid on this Project

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Mar 31, 2026
Client-ready brief
Executive summary
medium confidencegpt 5.2

This notice (ID: ma_commbuys_b7cc4a9fe06dffaf0ec1) is titled “608940 WESTON FAP No. HSI-0036(022)X Intersection Improvements Boston Post Road (Route 20) at Wel” and is issued by 0H100 – HIGHWAY. The response deadline shown is 2026-04-28T14:00:00+00:00. The description explicitly states: “Do Not Use COMMBUYS to Bid on this Project,” so the primary capture action is to obtain the attached bid detail package and follow the alternate bidding instructions. SBPP Eligible is marked YES, which may affect eligibility/participation requirements depending on the actual procurement method described in the attachment.

608940WestonFAP No. HSI-0036(022)XIntersection ImprovementsBoston Post RoadRoute 200H100 HIGHWAYDo Not Use COMMBUYS
What the buyer is trying to do

Procure intersection improvements for Boston Post Road (Route 20) in Weston under project reference “FAP No. HSI-0036(022)X” (as indicated in the title), using a submission method other than COMMBUYS.

Who should pursue this
  • Firms experienced in roadway/intersection improvement construction and related civil/highway work, able to comply with the non-COMMBUYS submission process required by 0H100 – HIGHWAY
  • SBPP-eligible small businesses if the attachment confirms SBPP participation requirements or preferences for this procurement
Work breakdown
  • Review the attached bid detail package from COMMBUYS download link for full scope, plan/specs, and bid submission instructions
  • Confirm bid submission channel (non-COMMBUYS) and required forms per the attachment
  • Prepare bid package for intersection improvements at Boston Post Road (Route 20) in Weston (per the attachment’s technical requirements)
  • Validate SBPP eligibility implications (noted as “SBPP Eligible: YES”) against the actual bid instructions
Response package checklist
  • Download and review the attached bid detail package (docId BD-26-1030-0H100-0H002-127285; downloadFileNbr=2207202) for complete bid requirements
  • Confirm and follow the non-COMMBUYS bid submission method stated in the attachment
  • Include all bid forms, certifications, and pricing schedules required in the attachment
  • Submit by the stated deadline: 2026-04-28T14:00:00+00:00
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Do not submit the bid through COMMBUYS; the notice explicitly instructs: “Do Not Use COMMBUYS to Bid on this Project.”
  • SBPP status is indicated as eligible ("SBPP Eligible: YES"); confirm any mandatory/optional SBPP steps in the attachment
Pricing strategy
  • Price to the bid schedule and measurement/payment items contained in the attachment; the notice text itself does not provide bid items or quantities
  • Account for compliance/admin effort created by the non-COMMBUYS submission process (e.g., packaging, delivery method) as allowed by the bid structure in the attachment
Teaming and subs
  • Identify subcontractors aligned with intersection improvement work once the attachment clarifies scope (e.g., traffic control, pavement markings/signage, signal work) and ensure they can meet the submission and compliance requirements stated outside COMMBUYS
Risks and watchouts
  • Disqualification risk if any part of the bid is submitted through COMMBUYS contrary to the instruction in the description
  • High risk of missing required forms or submission steps because key requirements appear to be contained only in the attachment link
  • NAICS/PSC fields appear inconsistent or broad in the notice (NAICS listed as 72, 14, 10); rely on the attachment for the actual construction classification and compliance requirements
Smart questions to ask
  • What is the exact bid submission method (mail, in-person drop, email portal, etc.) and where is it specified in the attached bid detail package?
  • Does “SBPP Eligible: YES” impose any required small business participation documentation for this specific bid, and if so, what forms are required?
  • Are there addenda outside COMMBUYS, and how will addenda be issued given the instruction not to bid via COMMBUYS?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Attachment contents (scope, bid forms, submission method, location details, and technical requirements) are not provided in the brief

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.