607349 NORWELL- PEMBROKE- MARSHFIELD- BRIDGE REPLACEMENT, N-24-004=P-05-008, ROUTE 3 (NB & SB) OVER
Federal opportunity from 0H100 - HIGHWAY • Department of Transportation. Place of performance: MA. Response deadline: Apr 14, 2026. Industry: Source industry codes 72, 14, 11.
- Source
- Open on official portal →
- Solicitation
- BD-26-1030-0H100-0H002-124895
- Performance
- Park Plaza Boston, MA 02116
- Response
- Apr 14, 2026, 12:00 PM UTC
Point of Contact
Agency & Office
Applicable wage determinations
Best public WD match for the notice location and scope.
View more WD detail3 more WD matches and 88 more rate previews.↓
Description
The Massachusetts Department of Transportation (MassDOT) is soliciting Letters of Interest from parties interested in the Request for Qualifications (RFQ) package for this Design-Build Project
Pricing and bid posture
Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.
This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The Massachusetts Department of Transportation (MassDOT) is seeking Letters of Interest for a Design-Build project focused on bridge replacements along Route 3, specifically in Norwell, Pembroke, Marshfield. The project is set aside for Small Business Participation Program (SBPP) eligible firms. The response deadline for submitting qualifications is March 10, 2026.
MassDOT is looking for qualified parties to engage in a Request for Qualifications (RFQ) process for a significant bridge replacement project on Route 3.
- Small businesses with experience in design-build projects
- Firms specializing in bridge design and construction
- Contractors with prior work for MassDOT
- Prepare and submit Letters of Interest
- Review RFQ package details
- Gather necessary documentation and qualifications
- Identify potential teaming partners
- Develop project timeline and milestones
- Letter of Interest
- Qualifications statement
- Team structure and resources
- Recent project experience
- Insurance and bonding capability
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Ensure eligibility under SBPP
- Adhere to Massachusetts state contracting regulations
- Follow guidelines laid out in the RFQ package
- Determine competitive pricing that reflects the design-build scope
- Consider potential for cost-sharing arrangements with bidders on project phases
- Seek partnerships with local engineering firms
- Consider subcontracting opportunities for small businesses
- Explore joint ventures with experienced contractor teams
- Potential for delays in submissions due to strict RFQ requirements
- Need to clearly demonstrate relevant experience to stand out
- Compliance with SBPP eligibility needs to be verified thoroughly
- What specific qualifications are being prioritized in the RFQ?
- Are there any pre-qualification meetings or workshops planned?
- Can we receive feedback on our submission post-evaluation?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Specific project budget estimates
- Clarification on the timeline for project completion
- Additional requirements from the RFQ package
Service match
Optional support routes matched to this notice after the core solicitation details.
Other matched support routes↓
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.