Culvert Strengthening
Federal opportunity from TCH001 - Town of Cheshire • Town of Cheshire. Place of performance: MA. Response deadline: Feb 17, 2026. Industry: NAICS UNSPSC 72-14-00.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
More in NAICS UNSPSC 72-14-00
Description
Culvert Strengthening West Mtn Rd over Kitchen Brook. MassDOT Prequal "Bridge-Culvert" for $490,735 required. Project must be completed by Oct 1, 2026
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The Town of Cheshire (TCH001) is soliciting a contractor for “Culvert Strengthening” on West Mtn Rd over Kitchen Brook. Bidders must hold MassDOT prequalification in “Bridge-Culvert” for $490,735. Responses are due by 2026-02-17 14:00 UTC. The project has a hard completion requirement: must be finished by Oct 1, 2026.
Strengthen an existing culvert carrying West Mtn Rd over Kitchen Brook, using a contractor that meets MassDOT “Bridge-Culvert” prequalification at the stated capacity level, and deliver completion by Oct 1, 2026.
- Bid and deliver culvert strengthening construction for West Mtn Rd over Kitchen Brook (Town of Cheshire).
- Verify/maintain MassDOT prequalification status: “Bridge-Culvert” with capacity of at least $490,735 (as stated).
- Plan and execute work to meet required project completion by Oct 1, 2026.
- Submit a complete bid/proposal by the response deadline (2026-02-17 14:00 UTC).
- Evidence of current MassDOT prequalification: category “Bridge-Culvert” and confirmation of $490,735 capacity (include official documentation).
- Project schedule narrative demonstrating feasibility to complete by Oct 1, 2026.
- Relevant past performance for culvert/bridge-culvert strengthening/rehabilitation projects (especially municipal/MassDOT-context work).
- Key personnel and subcontractor plan for culvert/structural, traffic control, and environmental controls as applicable.
- Bid/proposal submission formatted per the solicitation instructions (not provided in brief; confirm requirements).
Source coverage notes
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Solicitation number and notice type
- Bid documents/plans/specifications and bid forms
- Place of performance details beyond location text
- Period of performance start date
- Evaluation/award method and selection criteria
- Engineer’s estimate and bid schedule of items
- Permitting/environmental constraints for Kitchen Brook
- Traffic control requirements and allowable work hours
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.