Skip to content
Executive Office of Energy and Environmental Affairs

Rebid FY26 OLE Cloud-Hosted IMC Solution Project RFQ Ticket 373609

Solicitation: Not available
Notice ID: ma_commbuys_a2b1fbd083049570e6aa

Federal opportunity from IT - Information Technology • Executive Office of Energy and Environmental Affairs. Place of performance: MA. Response deadline: Mar 20, 2026. Industry: NAICS 81, 11, 00.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$533,953,549
Sector total $533,953,549 • Share 100.0%
Live
Median
$139,000
P10–P90
$30,125$967,312
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($533,953,549)
Deal sizing
$139,000 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for MA
Live POP
Place of performance
Energy & Environmental Affairs Information Technology 100 Cambridge Street 9th Floor Boston, MA 02114 US Email: eea-itadmin@mass.gov Phone: (617) 626-1222
State: MA
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
MA20260010 (Rev 0)
Match signal: state matchOpen WD
Published Jan 02, 2026Massachusetts • Berkshire, Franklin, Hampden +1
Rate
BOILERMAKER
Base $50.62Fringe $28.82
Rate
BRICKLAYER BRICKLAYERS; CEMENT MASONS; PLASTERERS; STONE MASONS; MARBLE, TILE & TERRAZZO WORKERS
Base $50.81Fringe $32.27
+64 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 64 more rate previews.
Davis-BaconBest fitstate match
MA20260010 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Berkshire, Franklin, Hampden +1
Rate
BOILERMAKER
Base $50.62Fringe $28.82
Rate
BRICKLAYER BRICKLAYERS; CEMENT MASONS; PLASTERERS; STONE MASONS; MARBLE, TILE & TERRAZZO WORKERS
Base $50.81Fringe $32.27
Rate
DIVER TENDER
Base $61.70Fringe $35.47
+63 more occupation rates in this WD
Davis-Baconstate match
MA20260011 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Franklin
Rate
Insulator/asbestos worker (Includes the application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems.)
Base $44.36Fringe $36.63
Rate
BOILERMAKER
Base $50.62Fringe $28.82
Rate
BRICKLAYER BRICKLAYERS; CEMENT MASONS; PLASTERERS; STONE MASONS; MARBLE, TILE & TERRAZZO WORKERS
Base $50.81Fringe $32.27
+54 more occupation rates in this WD
Davis-Baconstate match
MA20260019 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Hampden
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
Rate
Group 2
Base $57.18Fringe $33.70
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $42.88Fringe $31.04
+21 more occupation rates in this WD
Davis-Baconstate match
MA20260007 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Franklin
Rate
CARPENTER
Base $43.33Fringe $27.82
Rate
Power equipment operators: (1) Backhoe/Excavator/Trackhoe
Base $42.88Fringe $31.04
Rate
A (1) Loader
Base $42.88Fringe $31.04
+8 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
Executive Office of Energy and Environmental Affairs
Agency
IT - Information Technology
Subagency
IT - Information Technology
Office
Janeene Davis
Contracting Office Address
Not available

Description

Bid Opening date equals Bid Closing date.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Mar 04, 2026
Client-ready brief
Executive summary
medium confidencegpt 5.2

This is a rebid RFQ for the “FY26 OLE Cloud-Hosted IMC Solution Project” (RFQ Ticket 373609) issued by “IT - Information Technology.” The response deadline is 2026-03-12T16:00:00+00:00, and the notice states the bid opening date equals the bid closing date. The opportunity appears to be for a cloud-hosted IMC solution in support of OLE for FY26, but the specific technical and contractual requirements are contained in the attachment link. Set-aside status is listed as “SBPP Eligible: NO,” so vendors should confirm eligibility constraints and evaluate competitiveness under full/open participation rules per the solicitation documents.

RebidFY26OLECloud-HostedIMC SolutionRFQTicket 373609CommBuys
What the buyer is trying to do

Source a cloud-hosted IMC solution for the FY26 OLE project via an RFQ rebid (Ticket 373609), with offers due by 2026-03-12 16:00 UTC and no SBPP set-aside.

Who should pursue this
  • Vendors that can provide a cloud-hosted IMC solution and associated services as defined in the RFQ attachment for the FY26 OLE project.
  • Firms comfortable competing when “SBPP Eligible: NO” (i.e., not restricted to SBPP).
Work breakdown
  • Review the CommBuys attachment for the detailed statement of work/specifications for the “Cloud-Hosted IMC Solution” and any required service components (implementation, hosting, support, licensing).
  • Prepare and submit an RFQ response package by 2026-03-12T16:00:00+00:00, ensuring all required forms and pricing schedules from the attachment are completed.
  • Confirm bid submission mechanics and timing because the notice states bid opening date equals bid closing date.
Response package checklist
  • Download and comply with all requirements in the posted attachment (CommBuys bid detail downloadFileNbr=2194370).
  • Completed pricing per the RFQ format in the attachment (e.g., price sheet, rate card, licensing/hosting/support costs if required).
  • Technical/approach narrative responding to the IMC solution requirements in the attachment.
  • Required representations/certifications and any Commonwealth/CommBuys specific forms included in the attachment.
  • Submission confirmation aligned to the rule that bid opening date equals bid closing date.
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Set-aside is listed as “SBPP Eligible: NO”; confirm any eligibility/participation rules within the attachment and ensure your response aligns.
  • Treat 2026-03-12T16:00:00+00:00 as a hard deadline; late submissions may not be accepted, especially since opening equals closing.
Pricing strategy
  • Use the RFQ’s required pricing structure from the attachment; avoid alternative formats unless explicitly allowed.
  • Because this is a rebid, validate that your pricing reflects any clarified or revised scope contained in the attachment versus prior iterations.
Teaming and subs
  • If the attachment includes security/compliance, migration, integration, or managed hosting obligations, consider teaming with a specialist sub for any gaps while keeping one prime accountable for the cloud-hosted IMC deliverable.
Risks and watchouts
  • Requirements are primarily in the attachment; missing a mandatory form, pricing tab, or submission instruction is a common disqualification risk.
  • Rebid status can indicate prior procurement issues (scope/pricing/compliance); ensure your response explicitly addresses the RFQ’s updated requirements in the attachment.
  • “Bid Opening date equals Bid Closing date” increases operational risk—plan to submit early to avoid system/access issues near the deadline.
Smart questions to ask
  • Does the rebid include changes to scope, evaluation criteria, or pricing structure compared to the prior RFQ version for Ticket 373609?
  • What are the required hosting location, security standards, and compliance obligations for the cloud-hosted IMC solution as defined in the attachment?
  • What are the required deliverables and acceptance criteria (implementation milestones, uptime/SLA, support hours, training) per the attachment?
  • Is pricing expected as fixed price, subscription, hourly rates, or a combination, and are there specific line-item constraints in the attachment?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Attachment contents (scope, deliverables, evaluation, pricing format, and any mandatory forms) are not provided in the brief.
  • Solicitation number, notice type, posted date, and place/period of performance details are not included.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.