Installation of Backup Generator at Ferry Road Pump Station
Federal opportunity from TA123 - Town of Hatfield • Town of Hatfield. Place of performance: MA. Response deadline: Apr 01, 2026. Industry: NAICS UNSPSC 26-11-16.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
Point of Contact
Agency & Office
More in NAICS UNSPSC 26-11-16
Description
The Base Bid work consists of installation of a backup generator system and automatic transfer switch at the Ferry Road Pump Station, site restoration and pavement repair. The work is estimated to cost $475,000. Additive Alternate No. 1 work consists of installation of a backup generator system and automatic transfer switch at the King Street Pump Station.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The Town of Hatfield is soliciting bids for the installation of a backup generator system at the Ferry Road Pump Station, with a total estimated cost of $475,000. Bidders will also have the option to present a proposal for additional work at the King Street Pump Station. This opportunity is crucial for ensuring reliable operations of the pump stations, enhancing the town's infrastructure resilience.
The buyer aims to procure a contractor for the installation of backup generator systems, ensuring uninterrupted service at critical infrastructure sites.
- Installation of backup generator system
- Installation of automatic transfer switch
- Site restoration
- Pavement repair
- Additive Alternate No. 1 for King Street Pump Station
- Completed bid proposal forms
- Proof of relevant licenses and certifications
- References for similar projects
- Detailed project timeline
- Pricing breakdown for base and additive alternate work
Source coverage notes
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Specific start and end dates for the project are not provided
- Details on warranty or maintenance requirements are unclear
- Information on expected contractor qualifications and certifications is missing
- No information on site access or restrictions during installation
- No details on potential local incentives for infrastructure improvements
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.