Roxbury Community College Switchgear Replacement: BDO D26-NT2V
Federal opportunity from RCC01 - Roxbury Community College • Roxbury Community College. Place of performance: MA. Response deadline: Mar 06, 2026. Industry: NAICS UNSPSC 72-15-15.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
More in NAICS UNSPSC 72-15-15
Description
Roxbury Community College Switchgear Replacement: BDO D26-NT2V The contractor shall remove the existing medium-voltage switchgear, dispose of it properly, install the new switchgear with all required connections and grounding, coordinate shutdowns and energization with the Awarding Authority and Eversource, and complete all testing and restoration. Electrical Contractor will be the Prime. Documents will be available https://biddocs.com/
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The Roxbury Community College is seeking proposals for the Switchgear Replacement project under solicitation BDO D26-NT2V. This project entails the removal of existing medium-voltage switchgear, proper disposal, and installation of new switchgear, including all connections and grounding, with a response deadline set for March 6, 2026. Coordination with both the Awarding Authority and Eversource is essential, making it crucial for bidders to have experience in electrical contracting.
The buyer aims to replace existing medium-voltage switchgear at Roxbury Community College, ensuring proper installation and compliance with safety standards.
- Remove existing medium-voltage switchgear
- Dispose of existing switchgear
- Install new switchgear with required connections and grounding
- Coordinate shutdowns with the Awarding Authority and Eversource
- Complete all testing and restoration of service
- Proof of electrical contractor licensing
- List of prior switchgear installation projects
- Safety and compliance documentation
- Plan for coordination with Eversource
Source coverage notes
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Exact location for the performance of the work is not specified.
- No specific budget range for the project is provided.
- Details on the disposal methods for the existing switchgear are unclear.
- No information on the requirements for testing and restoration procedures is provided.
- No points of contact for clarifications are mentioned.
- Clarification on pre-bid meetings or site visits is not provided.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.