Upgrades to Public Water System at Pine Hill Elementary School
Federal opportunity from TSH01 - Town of Sherborn • Town of Sherborn. Place of performance: MA. Response deadline: Mar 26, 2026. Industry: NAICS UNSPSC 47-10-15.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 64 more rate previews.↓
Point of Contact
Agency & Office
More in NAICS UNSPSC 47-10-15
Description
Construction of upgrades to the public water system serving Pine Hill Elementary School.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The Town of Sherborn is seeking proposals for upgrades to the public water system at Pine Hill Elementary School. This construction project is part of ongoing improvements to ensure that the facility meets current water supply standards. Proposals must be submitted by March 26, 2026, which allows ample time for planning and organization.
The buyer is looking to enhance the public water system at Pine Hill Elementary School, likely to improve water quality and supply reliability for students and staff.
- Assess current water system conditions
- Design upgraded water infrastructure
- Execute construction of upgrades
- Conduct testing and compliance checks post-upgrade
- Provide ongoing maintenance recommendations
- Company profile and relevant experience
- Detailed project plan and timeline
- Cost estimate and pricing breakdown
- Compliance with local and state regulations
- References from previous water system projects
Source coverage notes
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Detailed specifications for the upgrades
- Total project budget and funding sources
- Previous assessments or studies on the current system
- Specific water quality standards to meet
- Information on project oversight and management
- Potential local partnerships
- Historical challenges with the existing infrastructure
- Local regulations concerning water project approvals
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.