Senior Center Parking Lot Improvement Project (DPW 26-2)
Federal opportunity from DPW06 - Holden Department of Public Works • Town of Holden. Place of performance: MA. Response deadline: Mar 05, 2026. Industry: Source industry codes 72, 14, 10.
- Source
- Open on official portal →
- Solicitation
- BD-25-1281-DPW06-DPW06-125346
- Performance
- Industrial Drive Holden, MA 01520
- Response
- Mar 05, 2026, 11:00 AM UTC
Point of Contact
Agency & Office
Applicable wage determinations
Best public WD match for the notice location and scope.
View more WD detail3 more WD matches and 88 more rate previews.↓
Description
The work under this contract consists of reconstructing and widening the existing parking lot for the Holden Senior Center as well reconstructing and realigning the roadway entering the parking lot, known as Bascom Parkway.
Pricing and bid posture
Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.
This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The Senior Center Parking Lot Improvement Project (DPW 26-2) involves reconstructing and widening the existing parking lot for the Holden Senior Center, as well as realigning the roadway known as Bascom Parkway. The deadline for proposal submissions is set for March 5, 2026. This project presents an opportunity for contractors with expertise in site development and roadway construction to enhance community facilities.
The Holden Department of Public Works is aiming to improve accessibility and safety at the Senior Center by modernizing both the parking lot and the access roadway.
- Contractors with experience in parking lot construction
- Companies specializing in roadway improvements
- Local firms familiar with municipal projects
- Reconstruct existing parking lot
- Widen existing parking lot
- Realign Bascom Parkway leading to parking lot
- Detailed project proposal
- Timeline for completion
- Cost estimates
- Qualifications and experience of key personnel
- References from similar projects
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Must adhere to local construction regulations
- Safety protocols during construction activities
- Competitively priced bids with clear breakdowns are recommended
- Consideration of materials and labor costs should be transparent
- Local subcontractors for specialized tasks (e.g., asphalt paving)
- Environmental firms for compliance and assessments
- Potential for unforeseen site conditions (e.g., soil stability)
- Weather-related delays during construction
- Compliance with local regulations may require additional time
- What is the budget allocated for this project?
- Are there specific sustainability goals for the materials used?
- What local permits are required prior to starting construction?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Specific budget for project not provided
- Start and end dates for the performance period are missing
- Details on mandatory qualifications or certifications for bidders are lacking
- Information on any pre-bid meetings or site visits is absent
- Clarification on required specifications for materials is not included
Service match
Optional support routes matched to this notice after the core solicitation details.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.