Oak Bluffs Wesleyan and Niantic Parks Walkways Project
Federal opportunity from TOOB1 - Administrator's Office • Town of Oak Bluffs. Place of performance: MA. Response deadline: Mar 20, 2026. Industry: NAICS UNSPSC 30-12-18.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 46 more rate previews.↓
Point of Contact
Agency & Office
More in NAICS UNSPSC 30-12-18
Description
The Town of Oak Bluffs Parks department is seeking quotes from qualified landscaping contractors for the installation of new ADA compliant walkways at Wesleyan & Niantic Parks in Oak Bluffs, MA 02557.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The Town of Oak Bluffs Parks department is soliciting qualified landscaping contractors for the installation of new ADA compliant walkways at both Wesleyan and Niantic Parks. Responses are due by March 20, 2026, providing a significant window for preparation. With the project located in Oak Bluffs, MA, this opportunity specifically caters to contractors with landscaping experience and ADA compliance skills.
The buyer aims to enhance accessibility in Wesleyan and Niantic Parks by installing ADA compliant walkways, ensuring inclusivity for all park visitors.
- Assess current park conditions
- Design ADA compliant walkways
- Execute landscaping work
- Quality assurance and inspections
- Final project walkthrough and approval
- Completed bid form
- Company qualifications and experience
- Estimated project timeline
- Pricing structure
- Compliance certifications
Source coverage notes
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Detailed scope of walkway specifications
- Exact measurements of the walkways needed
- Budget constraints or range for bids
- Any existing infrastructure that may affect installation
- Clarification on existing contractor relationships
- Details on required permits and approvals
- Information on community engagement or public consultation involved
- Timeline for potential follow-up projects
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.