Skip to content
Town of Medway

IFB - Village St at Holliston St Complete Streets Improvement

Solicitation: Not available
Notice ID: ma_commbuys_1b7d1742f120767ed646
NAICS UNSPSC 30-12-00DepartmentTown of MedwayAgencyTABOS - Town ManagerStateMAPostedDueMar 19, 2026, 10:00 AM UTCCloses in 14 days

Federal opportunity from TABOS - Town Manager • Town of Medway. Place of performance: MA. Response deadline: Mar 19, 2026. Industry: NAICS UNSPSC 30-12-00.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$1,108,959,695
Sector total $1,108,959,695 • Share 100.0%
Live
Median
$163,850
P10–P90
$31,586$1,393,134
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($1,108,959,695)
Deal sizing
$163,850 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for MA
Live POP
Place of performance
A Potter 155 Village Street Medway, MA 02053 US Email: ta@medwayma.gov Phone: (508) 533-3264
State: MA
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Published Jan 02, 2026
Massachusetts • Hampden
POWER EQUIPMENT OPERATOR Group 1
Base: $57.83 • Fringe: $33.70
Group 2
Base: $57.18 • Fringe: $33.70
POWER EQUIPMENT OPERATOR Group 1
Base: $42.88 • Fringe: $31.04
Match signal: state match
Published Jan 02, 2026
Massachusetts • Middlesex
ELECTRICIAN
Base: $66.17 • Fringe: $37.08
POWER EQUIPMENT OPERATOR Group 1
Base: $57.83 • Fringe: $33.70
Group 2
Base: $57.18 • Fringe: $33.70
Match signal: state match
Published Jan 02, 2026
Massachusetts • Franklin
CARPENTER
Base: $43.33 • Fringe: $27.82
Power equipment operators: (1) Backhoe/Excavator/Trackhoe
Base: $42.88 • Fringe: $31.04
A (1) Loader
Base: $42.88 • Fringe: $31.04
Match signal: state match
Published Jan 02, 2026
Massachusetts • Suffolk
ELECTRICIAN (Includes Traffic Signalization)
Base: $66.17 • Fringe: $37.08
POWER EQUIPMENT OPERATOR Group 1
Base: $57.83 • Fringe: $33.70
Group 2
Base: $57.18 • Fringe: $33.70
Match signal: state match

Point of Contact

Not available

Agency & Office

Department
Town of Medway
Agency
TABOS - Town Manager
Subagency
TABOS - Town Manager
Office
Allison Potter
Contracting Office Address
Not available

More in NAICS UNSPSC 30-12-00

Description

IFB for complete street improvements at Village St at Holliston St. Bid doc available at https://medwayma.gov/purchasing/ or DPW Office, 45B Holliston St, Door 9, Medway during business hours. Select Board awards the contract. Est. value: $782K.

Files

Files size/type shown when available.

No downloadable attachments detected for this notice.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Feb 26, 2026
Executive summary

The Town of Medway is seeking bids for the IFB concerning complete street improvements at Village St at Holliston St. The estimated value of the project is $782,000, with bids due by March 19, 2026. Bid documents can be obtained from the Town's website or the DPW Office. This project is an opportunity for firms specializing in street improvements to engage in a significant municipal contract in the region.

What the buyer is trying to do

The Town Manager's office aims to improve the streetscape and infrastructure at the intersection of Village St and Holliston St to enhance transportation safety and accessibility.

Work breakdown
  • Obtain bid documents from the provided sources.
  • Prepare and submit bid proposal.
  • Address any questions or clarifications regarding the project.
  • Implement the complete street improvements as per specifications.
  • Coordinate with the Select Board for contract award.
Response package checklist
  • Completed bid proposal form.
  • Proof of experience and previous projects.
  • Financial bid and cost breakdown.
  • Timeline for project completion.
  • Any required licenses and certifications.
Suggested keywords
Complete StreetsInfrastructure ImprovementMunicipal ContractRoadway ConstructionBid Proposal
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Specific technical requirements for the complete street improvements are not detailed.
  • Details about community engagement or public feedback isn't provided.
  • Information on existing conditions at the site is absent.
  • No mention of required bonding or insurance levels for bidders.
  • Lack of specifics on potential funding sources or grants for the project.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.