Skip to content
City of Worcester

8650-M6 Resurfacing Various Roads (M25-4) / DPW

Solicitation: Not available
Notice ID: ma_commbuys_0eae4711adda995cb251
NAICS 72, 14, 10DepartmentCity of WorcesterAgencyPUR001 - Purchasing DepartmentStateMAPostedDueMar 25, 2026, 10:00 AM UTCExpired

Federal opportunity from PUR001 - Purchasing Department • City of Worcester. Place of performance: MA. Response deadline: Mar 25, 2026. Industry: NAICS 72, 14, 10.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$533,953,549
Sector total $533,953,549 • Share 100.0%
Live
Median
$139,000
P10–P90
$30,125$967,312
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($533,953,549)
Deal sizing
$139,000 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for MA
Live POP
Place of performance
Chris Gagliastro 455 Main Street Room 201 Worcester, MA 01608 US Email: purchasing@worcesterma.gov Phone: (508) 799-1220
State: MA
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
MA20260010 (Rev 0)
Match signal: state matchOpen WD
Published Jan 02, 2026Massachusetts • Berkshire, Franklin, Hampden +1
Rate
BOILERMAKER
Base $50.62Fringe $28.82
Rate
BRICKLAYER BRICKLAYERS; CEMENT MASONS; PLASTERERS; STONE MASONS; MARBLE, TILE & TERRAZZO WORKERS
Base $50.81Fringe $32.27
+64 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 64 more rate previews.
Davis-BaconBest fitstate match
MA20260010 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Berkshire, Franklin, Hampden +1
Rate
BOILERMAKER
Base $50.62Fringe $28.82
Rate
BRICKLAYER BRICKLAYERS; CEMENT MASONS; PLASTERERS; STONE MASONS; MARBLE, TILE & TERRAZZO WORKERS
Base $50.81Fringe $32.27
Rate
DIVER TENDER
Base $61.70Fringe $35.47
+63 more occupation rates in this WD
Davis-Baconstate match
MA20260011 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Franklin
Rate
Insulator/asbestos worker (Includes the application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems.)
Base $44.36Fringe $36.63
Rate
BOILERMAKER
Base $50.62Fringe $28.82
Rate
BRICKLAYER BRICKLAYERS; CEMENT MASONS; PLASTERERS; STONE MASONS; MARBLE, TILE & TERRAZZO WORKERS
Base $50.81Fringe $32.27
+54 more occupation rates in this WD
Davis-Baconstate match
MA20260019 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Hampden
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
Rate
Group 2
Base $57.18Fringe $33.70
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $42.88Fringe $31.04
+21 more occupation rates in this WD
Davis-Baconstate match
MA20260007 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Franklin
Rate
CARPENTER
Base $43.33Fringe $27.82
Rate
Power equipment operators: (1) Backhoe/Excavator/Trackhoe
Base $42.88Fringe $31.04
Rate
A (1) Loader
Base $42.88Fringe $31.04
+8 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
City of Worcester
Agency
PUR001 - Purchasing Department
Subagency
PUR001 - Purchasing Department
Office
Stephen McDonald
Contracting Office Address
Not available

Description

8650-M6 Resurfacing Various Roads (M25-4) / DPW. Solicitation notice from City of Worcester. Review the official posting for scope, requirements, and submission details.

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Mar 23, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

The City of Worcester is seeking bids for the resurfacing of various roads under the solicitation 8650-M6. The response deadline for this bid is set for March 25, 2026. Companies specializing in road construction and resurfacing should review the official posting for detailed scope and requirements.

road resurfacingWorcesterpublic worksroad constructioncontractors
What the buyer is trying to do

The buyer aims to engage contractors to resurface various roads to improve road infrastructure and safety in Worcester.

Who should pursue this
  • Contractors with experience in road resurfacing
  • Companies with relevant qualifications and certifications
  • Firms that can demonstrate past performance in similar projects
Work breakdown
  • Review official solicitation posting for detailed requirements
  • Prepare bid proposals including technical qualifications
  • Submit bids by the response deadline of March 25, 2026
  • Ensure compliance with all local regulations and standards
Response package checklist
  • Completed bid proposal
  • Evidence of past performance
  • Relevant certifications and licenses
  • Compliance documentation with local regulations
  • Pricing proposal
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Ensure bids adhere to City of Worcester procurement regulations
  • Verify all proposed materials meet state and local standards
Pricing strategy
  • Consider competitive pricing based on current market rates for road work
  • Include all cost factors such as labor, materials, and overhead
Teaming and subs
  • Consider partnering with local subcontractors experienced in road work
  • Identify suppliers for road materials to ensure timely delivery
Risks and watchouts
  • Potential delays due to weather affecting the resurfacing timeline
  • Competition from other firms may drive prices down
  • Regulatory compliance issues may arise if documentation is incomplete
Smart questions to ask
  • What are the specific materials and methods required for the resurfacing?
  • Are there penalties for delays, and what are the completion timelines?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Detailed scope of work not provided
  • Specific requirements for bidding not outlined
  • Pricing guidelines or estimates not included
  • No information about pre-bid meetings or site visits
  • Absence of attachment links for additional details

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.