Skip to content
University of Massachusetts System

CLARK GYMNASIUM HOOPS REPLACEMEN

Solicitation: Not available
Notice ID: ma_commbuys_f68b777145b5b581cff0
NAICS 72, 13, 00DepartmentUniversity of Massachusetts SystemAgencyUMBOS - Boston CampusStateMAPostedDueFeb 18, 2026, 02:00 PM UTCExpired

Federal opportunity from UMBOS - Boston Campus • University of Massachusetts System. Place of performance: MA. Response deadline: Feb 18, 2026. Industry: NAICS 72, 13, 00.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$7,094,851,529
Sector total $7,094,851,529 • Share 100.0%
Live
Median
$229,838
P10–P90
$30,957$1,277,308
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($7,094,851,529)
Deal sizing
$229,838 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for MA
Live POP
Place of performance
UPST Procurement Office 50 Washington Street Shrewsbury, MA 01581 US Email: upst@umassp.edu Phone: (774) 545-8778
State: MA
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
MA20260017 (Rev 0)
Match signal: state matchOpen WD
Published Jan 02, 2026Massachusetts • Bristol
Rate
ELECTRICIAN (Includes Traffic Signalization)
Base $66.17Fringe $37.08
Rate
POWER EQUIPMENT OPERATOR GROUP 1
Base $57.83Fringe $33.70
+23 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 23 more rate previews.
Davis-BaconBest fitstate match
MA20260017 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Bristol
Rate
ELECTRICIAN (Includes Traffic Signalization)
Base $66.17Fringe $37.08
Rate
POWER EQUIPMENT OPERATOR GROUP 1
Base $57.83Fringe $33.70
Rate
GROUP 2
Base $57.18Fringe $33.70
+22 more occupation rates in this WD
Davis-Baconstate match
MA20260019 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Hampden
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
Rate
Group 2
Base $57.18Fringe $33.70
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $42.88Fringe $31.04
+21 more occupation rates in this WD
Davis-Baconstate match
MA20260013 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Worcester
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR (Duct, Pipe, & Mechanical System Insulation)
Base $49.10Fringe $36.63
Rate
TILE FINISHER
Base $49.32Fringe $35.26
Rate
TILE SETTER
Base $64.52Fringe $37.51
+14 more occupation rates in this WD
Davis-Baconstate match
MA20260007 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Franklin
Rate
CARPENTER
Base $43.33Fringe $27.82
Rate
Power equipment operators: (1) Backhoe/Excavator/Trackhoe
Base $42.88Fringe $31.04
Rate
A (1) Loader
Base $42.88Fringe $31.04
+8 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
University of Massachusetts System
Agency
UMBOS - Boston Campus
Subagency
UMBOS - Boston Campus
Office
Michael Boyle
Contracting Office Address
Not available

Description

replace eight (8) basketball hoops, backboards, motors, and mechanisms in the Clark Center Gymnasium.

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Feb 17, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

The UMBOS - Boston Campus is seeking to replace eight basketball hoops, backboards, motors, and mechanisms at the Clark Center Gymnasium, with a response deadline set for February 18, 2026. This project aligns with facility upgrades and enhances the sporting infrastructure on campus. Companies with experience in gymnasium equipment installation and sports infrastructure upgrades are encouraged to bid.

gymnasium renovationbasketball equipment installationsports facilities upgradeClark Center GymnasiumBoston campus facilities
What the buyer is trying to do

The buyer aims to enhance the sports facilities by replacing outdated basketball equipment, ensuring safety and modern functionality.

Who should pursue this
  • Companies specializing in sports facilities renovation
  • Contractors with prior experience in athletic equipment installation
  • Firms that can provide customization options for gym facilities
Work breakdown
  • Assessment of current basketball equipment condition
  • Removal of existing hoops, backboards, and mechanisms
  • Installation of new basketball hoops and backboards
  • Installation of motors and associated mechanisms
  • Final testing and quality assurance check
Response package checklist
  • Detailed project plan and timeline
  • Previous project examples similar in scope
  • Proposed equipment specifications
  • Cost estimate and pricing strategy
  • Warranties and support offers
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Adherence to safety standards for sports equipment
  • Compliance with local building codes and regulations
  • Insurance and liability coverage requirements
Pricing strategy
  • Consider total cost of ownership for equipment maintenance
  • Include options for phased payment based on milestones
  • Research competitive pricing in the local market for similar projects
Teaming and subs
  • Partnering with local suppliers for basketball equipment
  • Involving specialized subcontractors for installation
  • Collaborating with facility managers for oversight and alignment
Risks and watchouts
  • Potential delays in equipment delivery impacting project timeline
  • Unforeseen structural issues within the gymnasium during installation
  • Budget overruns due to changes in scope or project requirements
Smart questions to ask
  • What is the existing condition of the current hoops and backboards?
  • Are there specific brands or types of equipment preferred?
  • What is the budget range set for this replacement project?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • No specified budget range for the project.
  • Lack of information about existing equipment removal procedures.
  • Absence of details regarding maintenance requirements post-installation.
  • No local performance location details provided.
  • Information on warranty or support services is missing.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.