UMAMH-2026-1012 McGuirk Stadium Improvements UMA26-13
Federal opportunity from UMAMH - Amherst Campus • University of Massachusetts System. Place of performance: MA. Response deadline: Apr 02, 2026. Industry: NAICS UNSPSC 72-10-00.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
Point of Contact
Agency & Office
More in NAICS UNSPSC 72-10-00
Description
McGuirk Stadium improvements phase 1 include adding stair & aisle handrails to grandstands, ADA lower bowl seating upgrades, installing ribbon LED videoboards, replacing the sound system, and Press Box HVAC upgrades per specifications. Bid/contract docs @ www.biddocs.com. DCAMM certs & Update Statements required.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The UMAMH is seeking bids for the first phase of improvements at McGuirk Stadium, with a response deadline of April 2, 2026. Key components of the project include ADA seating upgrades, new LED videoboards, and HVAC updates for the Press Box. Bidders are required to possess DCAMM certifications and submit Update Statements to be considered for this project.
The buyer aims to enhance the facilities at McGuirk Stadium, focusing on accessibility, modern technology installation, and overall structural improvements to meet current standards.
- Adding stair and aisle handrails to grandstands
- Upgrading ADA lower bowl seating
- Installing ribbon LED videoboards
- Replacing the sound system
- Upgrading Press Box HVAC
- Company qualifications and experience
- DCAMM certification documentation
- Detailed bid proposal with pricing
- Project timeline and milestones
- Insurance and bonding information
Source coverage notes
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Posting date is not provided
- Detailed specifications for the upgrades not included
- No information on budget or project funding
- Geographical limits for bids not specified
- Lack of mention regarding previous contractors or work history
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.