Skip to content
Town of Wrentham

Wrentham Housing Production Plan

Solicitation: Not available
Notice ID: ma_commbuys_e7cfc104e7e821e853bc
NAICS 72, 12, 00DepartmentTown of WrenthamAgencyWRTHM - Town of WrenthamStateMAPostedDueMar 05, 2026, 01:00 PM UTCExpired

Federal opportunity from WRTHM - Town of Wrentham • Town of Wrentham. Place of performance: MA. Response deadline: Mar 05, 2026. Industry: NAICS 72, 12, 00.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$7,205,695,420
Sector total $7,205,695,420 • Share 100.0%
Live
Median
$96,720
P10–P90
$28,298$2,037,759
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($7,205,695,420)
Deal sizing
$96,720 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for MA
Live POP
Place of performance
Michael King 79 South Street Wrentham, MA 02093 US Email: TMOffice@wrentham.gov Phone: (508) 384-5400 FAX: (508) 384-5403
State: MA
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
MA20260010 (Rev 0)
Match signal: state matchOpen WD
Published Jan 02, 2026Massachusetts • Berkshire, Franklin, Hampden +1
Rate
BOILERMAKER
Base $50.62Fringe $28.82
Rate
BRICKLAYER BRICKLAYERS; CEMENT MASONS; PLASTERERS; STONE MASONS; MARBLE, TILE & TERRAZZO WORKERS
Base $50.81Fringe $32.27
+64 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 64 more rate previews.
Davis-BaconBest fitstate match
MA20260010 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Berkshire, Franklin, Hampden +1
Rate
BOILERMAKER
Base $50.62Fringe $28.82
Rate
BRICKLAYER BRICKLAYERS; CEMENT MASONS; PLASTERERS; STONE MASONS; MARBLE, TILE & TERRAZZO WORKERS
Base $50.81Fringe $32.27
Rate
DIVER TENDER
Base $61.70Fringe $35.47
+63 more occupation rates in this WD
Davis-Baconstate match
MA20260011 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Franklin
Rate
Insulator/asbestos worker (Includes the application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems.)
Base $44.36Fringe $36.63
Rate
BOILERMAKER
Base $50.62Fringe $28.82
Rate
BRICKLAYER BRICKLAYERS; CEMENT MASONS; PLASTERERS; STONE MASONS; MARBLE, TILE & TERRAZZO WORKERS
Base $50.81Fringe $32.27
+54 more occupation rates in this WD
Davis-Baconstate match
MA20260019 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Hampden
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
Rate
Group 2
Base $57.18Fringe $33.70
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $42.88Fringe $31.04
+21 more occupation rates in this WD
Davis-Baconstate match
MA20260007 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Franklin
Rate
CARPENTER
Base $43.33Fringe $27.82
Rate
Power equipment operators: (1) Backhoe/Excavator/Trackhoe
Base $42.88Fringe $31.04
Rate
A (1) Loader
Base $42.88Fringe $31.04
+8 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
Town of Wrentham
Agency
WRTHM - Town of Wrentham
Subagency
WRTHM - Town of Wrentham
Office
Amanda Vasapollo
Contracting Office Address
Not available

Description

The Town of Wrentham, Massachusetts is seeking sealed proposals from qualified consultants to prepare a Housing Production Plan.

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Feb 21, 2026
Client-ready brief
Executive summary
medium confidencegpt 5.2

The Town of Wrentham (WRTHM - Town of Wrentham), Massachusetts is requesting sealed proposals from qualified consultants to prepare a Housing Production Plan. The response deadline is 2026-03-05T13:00:00+00:00. This is a consulting/planning effort (UNSPSC 72-12-00 listed) focused on producing a formal plan document for the Town. Bidders should be ready to present a clear planning methodology, stakeholder engagement approach, and a deliverable-driven schedule aligned to a sealed proposal submission.

Housing Production PlanTown of WrenthamWrentham Massachusettsmunicipal planning consultanthousing planningUNSPSC 72-12-00sealed proposals
What the buyer is trying to do

Select a qualified planning/housing consultant to develop a Housing Production Plan for the Town of Wrentham, MA, delivered through a formal sealed proposal process by the stated deadline.

Who should pursue this
  • Municipal planning consultants with direct experience developing Housing Production Plans for Massachusetts communities
  • Firms with demonstrated housing policy, land use planning, and community engagement capabilities for small-town municipal clients
Work breakdown
  • Proposal submission in sealed format by 2026-03-05T13:00:00+00:00
  • Project initiation: confirm scope, data needs, roles, and project schedule for the Housing Production Plan
  • Existing conditions assessment to support the Housing Production Plan (housing stock, needs, constraints, local context)
  • Stakeholder/community engagement activities to inform the plan (format and extent not specified in the notice)
  • Draft Housing Production Plan development, review cycles with the Town, and revisions
  • Final Housing Production Plan delivery (final document and any supporting materials, as required by the Town)
Response package checklist
  • Sealed proposal package compliant with the Town’s submission instructions (details not provided in notice)
  • Project approach/methodology specifically for preparing a Housing Production Plan
  • Work plan and schedule tied to major deliverables (draft and final plan)
  • Team organization, named key personnel, and relevant qualifications
  • Examples of comparable Housing Production Plans or similar municipal housing planning work
  • Price/cost proposal (structure not specified in notice)
  • Any required forms/certifications referenced in the solicitation package (not included in notice)
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Submission is explicitly “sealed proposals” — confirm packaging, labeling, and delivery method requirements in the full solicitation before submitting
  • Meet the response deadline: 2026-03-05T13:00:00+00:00
Pricing strategy
  • Because pricing format and evaluation criteria are not stated, prepare a clear, defensible cost tied to a deliverable-based work plan (e.g., fixed fee by task) and define assumptions that drive level of effort (number of meetings, rounds of review, outreach activities)
  • Offer add-alternates (if allowed in the solicitation) for optional engagement intensity or supplemental analyses, so the Town can scale within budget
Teaming and subs
  • Consider a prime municipal planning consultant with a housing policy specialist as a key staffer or subconsultant if your core team lacks deep housing production planning experience
  • If community engagement is expected, team with a facilitation/outreach partner to support public meetings, surveys, or workshop design (confirm needs in solicitation)
Risks and watchouts
  • Scope ambiguity: the notice provides only a high-level description; plan requirements, engagement expectations, and deliverable formats are unknown until the full solicitation is reviewed
  • Submission compliance risk: “sealed proposals” typically have strict delivery/format rules; missing them can render the bid non-responsive
  • Schedule risk: without a stated period of performance, you must propose a reasonable timeline while ensuring adequate time for engagement and Town review cycles
Smart questions to ask
  • Is there a full RFP/solicitation document with detailed scope, required plan components, and evaluation criteria?
  • What are the required deliverables and formats for the Housing Production Plan (including any required appendices, data tables, or implementation matrices)?
  • What level of community/stakeholder engagement does the Town expect (number of meetings, committees/boards to present to, workshop formats)?
  • What data sources should be used and what data will the Town provide (GIS, housing inventories, prior plans)?
  • What is the anticipated review/approval pathway for the plan (staff review, boards/committees, public hearings), and how many draft iterations are expected?
  • What is the required pricing format (fixed fee vs time-and-materials, task-based pricing) and are there budget constraints?
  • What are the submission instructions for sealed proposals (delivery address, electronic vs hardcopy, number of copies, required forms)?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Link or attachment to the full RFP/solicitation (scope, instructions, evaluation, required forms)
  • Solicitation number and notice type
  • Place of performance and submission location/delivery instructions for sealed proposals
  • Period of performance (start/end) and required milestone dates
  • Detailed deliverables and required plan components/format
  • Evaluation criteria and weighting (technical vs price)
  • Pricing structure requirements and any budget/ceiling
  • Required vendor qualifications/certifications and insurance requirements

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.