IFB2026-04 Town Hall Generator
Federal opportunity from WRTHM - Town of Wrentham • Town of Wrentham. Place of performance: MA. Response deadline: Feb 26, 2026. Industry: NAICS 72, 12, 00.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 64 more rate previews.↓
Point of Contact
Agency & Office
Description
IFB 2026-04 Town hall generator replacement
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The Town of Wrentham (WRTHM) has issued IFB 2026-04 for a Town Hall generator replacement. Bids are due 2026-02-26 at 14:00 UTC, and details appear to be contained in the CommBuys attachment linked in the notice. This is an Invitation for Bids (IFB), so expect award to hinge on responsiveness and price, with strict compliance to submittal and specification requirements. The opportunity is best suited for firms that can furnish and install a replacement generator for a municipal facility and can comply with any electrical/permitting requirements stated in the attachment.
Replace the existing Town Hall generator for the Town of Wrentham under IFB 2026-04, likely as a turnkey replacement package (equipment plus installation) per the specifications in the CommBuys attachment.
- Generator suppliers/installers that regularly perform municipal generator replacement projects
- Electrical contractors or generator service firms able to deliver and install a Town Hall generator replacement per an IFB specification and bid form
- Review the CommBuys attachment for generator replacement specifications, scope, and bid form requirements
- Provide a compliant bid for Town Hall generator replacement (equipment and any required installation activities as specified)
- Coordinate site work and installation requirements as defined in the attachment (e.g., electrical integration and any ancillary components included in the replacement)
- Completed IFB bid form(s) and pricing schedule from the CommBuys attachment
- Acknowledgment of any addenda (if issued in CommBuys)
- Technical cut sheets / compliance statement showing the offered generator meets the specified requirements (as required by the attachment)
- Delivery/installation schedule or timeline information if requested by the bid documents
- Any required certifications, licenses, or insurance documentation specified in the attachment
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Treat this as an IFB: ensure the bid is fully responsive to the written requirements and submitted exactly as instructed in the attached bid documents
- Use the CommBuys attachment as the controlling source for scope, submittal format, and any mandatory forms
- If the attachment indicates a turnkey replacement, structure pricing to clearly separate equipment vs. installation/ancillary costs only if the bid form allows; otherwise price exactly per the form
- Confirm whether alternates, options, or allowances are requested in the attachment before finalizing pricing
- Price for compliance and completeness over optimization—IFBs commonly reject bids for deviations or incomplete line items
- If your firm is primarily a generator supplier, consider teaming with a local electrical contractor for installation and integration work if the attachment requires it
- If your firm is primarily an electrical contractor, coordinate with a generator OEM/authorized distributor for equipment supply and warranty requirements if specified
- Scope ambiguity risk: the notice text is minimal; key requirements are likely only in the attachment—missing a mandatory form or spec could render the bid non-responsive
- Compliance risk typical to IFBs: any exceptions to generator specs, submittal instructions, or bid form structure may cause rejection
- Schedule risk: without posted date or performance window in the notice, confirm any required completion dates or liquidated damages language in the attachment
- Does the generator replacement scope include removal/disposal of the existing generator, and is that to be priced explicitly?
- Are there site-specific constraints at Town Hall (access, hours, outages) and are there required coordination procedures for shutdown/cutover?
- What permitting/inspection responsibilities are required under this IFB (and who pulls permits) as stated in the attachment?
- Are there required warranty terms, manufacturer authorization requirements, or service response commitments tied to the replacement?
- Are addenda anticipated, and how will addenda acknowledgments be handled for responsiveness?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Contents of the CommBuys attachment (specifications, scope details, mandatory forms, and submission instructions)
- Solicitation number field (blank in notice) beyond reference to IFB 2026-04
- Place of performance / site address for Town Hall work
- Period of performance / required completion date
- Any required bid security, insurance limits, or licensing requirements (likely in attachment)
- Evaluation/award terms specific to this IFB (e.g., lowest responsive/responsible bidder criteria details)
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.