Backstop & Fencing Project Multiple Field Locations
Federal opportunity from TMA01 - Office of the Town Manager • Town of Winchester. Place of performance: MA. Response deadline: Feb 26, 2026. Industry: NAICS UNSPSC 72-15-31.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
More in NAICS UNSPSC 72-15-31
Description
Fencing and Backstops repairs and replacements. Supply and Install Chain Link Fencing at the various athletic fields in Winchester.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The Office of the Town Manager (TMA01) is seeking a contractor for a “Backstop & Fencing Project Multiple Field Locations” focused on repairs and replacements at athletic fields in Winchester. The described work includes supply and installation of chain link fencing and backstop-related repairs/replacements across various field locations. The response deadline is 2026-02-26 11:00 UTC. This appears suited to fence installation contractors with municipal field/sports facility experience and the ability to manage multi-site work.
Repair and replace fencing and backstops at multiple athletic field locations in Winchester, including supplying and installing chain link fencing across various sites.
- Site walk/field verification at various athletic fields in Winchester (multiple locations implied)
- Repair and replacement of existing fencing and backstop components (as needed per field condition)
- Supply of chain link fencing materials
- Installation of chain link fencing at the various athletic fields
- Coordination of work sequencing across multiple field locations to minimize disruption
- Technical approach describing fencing and backstop repair/replacement methodology for multiple field locations
- Cut sheets/specifications for proposed chain link fencing materials to be supplied
- Project plan and schedule approach addressing multi-site execution
- Relevant past performance for athletic field fencing/backstops and municipal clients
- Warranty information for materials and workmanship (if offered)
- Safety plan applicable to work at active/public athletic fields (if required by the solicitation)
Source coverage notes
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Specific field locations and site access details for the multiple Winchester athletic fields
- Quantities and specifications for chain link fencing and backstops (heights, gauge, coating, gates, linear footage)
- Statement of work details differentiating repairs vs. replacements and any required standards
- Procurement details (solicitation number, notice type, set-aside, and submission instructions/format)
- Period of performance / required completion timeline
- Any attachments (drawings, plans, site photos) or links referenced by the buyer
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.